This project presents a comprehensive simulation study on Ethyl Benzene (EB) production optimization using Aspen Plus software. The work encompasses static optimization for minimum Total Annualized Cost (TAC) and dynamic process control analysis for an industrial-scale ethyl benzene production plant.
Student: Aadityaamlan Panda
Roll Number: 220007
Course: CHE352 - Simulation Lab
- Static Optimization: Minimize Total Annualized Cost (TAC) through systematic sensitivity analysis
- Dynamic Control: Implement and tune process control systems for stable operation
- Process Analysis: Evaluate material and energy balances across the production facility
- Economic Evaluation: Calculate capital costs, operating costs, and payback periods
The ethyl benzene production process consists of:
- 2 CSTR Reactors (200 Β΅mΒ³ each) - Alkylation reaction
- 3 Distillation Columns - Product separation and purification
- Heat Integration System - Energy optimization
- Feed Stream: Ethylene (95 mol%) + Ethane (5 mol%) - 105.26 kmol/h
- Benzene Makeup: Fresh benzene feed for reaction
- Product Stream: High-purity ethyl benzene (99.9+ mol%)
- Recycle Streams: Benzene recovery and unreacted materials
- Optimal Benzene Recycle Rate: 193.507 kmol/h
- Fresh Benzene Makeup: 100.207 kmol/h
- Energy Consumption: 3690.219 kW
- Benzene Purity in Recycle: 0.989 mol fraction
- Energy Reduction: 3689.311 kW
- Benzene Impurity in C2 Bottoms: 6.86 Γ 10β»β΅
- Significant Energy Reduction: 3484.453 kW
- EB Impurity in Recycle: 0.0012214
- Final Optimized Energy: 3483.458 kW
| Stream | Flow Rate (kmol/h) | Key Components |
|---|---|---|
| Feed | 105.26 | Ethylene (95%), Ethane (5%) |
| Benzene Makeup | 100.207 | Pure Benzene |
| Product (C3 Distillate) | 99.9106 | Ethyl Benzene (99.9%) |
| C1 Distillate | 5.56054 | Light Components |
| Equipment | Duty (kW) | Utility |
|---|---|---|
| C1 Reboiler | 636.028 | High Pressure Steam |
| C2 Reboiler | 1011.8 | Medium Pressure Steam |
| C3 Reboiler | 1835.631 | High Pressure Steam |
| Total Heating | 3483.459 | - |
| Total Cooling | -3804.491 | Cooling Water |
| Component | Cost (Γ10βΆ $) |
|---|---|
| Column C1 | 0.2586 |
| Column C2 | 1.9992 |
| Column C3 | 4.4117 |
| Total Capital Cost (TCC) | 6.6696 |
- Yearly Operating Cost (YOC): $1.0686 Γ 10βΆ
- Payback Period (PBP): 3 years
- Total Annualized Cost (TAC): $3.2918 Γ 10βΆ
- br_p: Benzene mole purity in recycle stream (0.9883)
- deb_p: Ethyl benzene impurity in C3 bottoms (0.0216)
- br_fr: Benzene flow rate in recycle (209.9439 kmol/h)
| Iteration | Initial Guess | Final TAC ($) |
|---|---|---|
| 1 | [0.96, 0.02, 190] | 1,747,200 |
| 2 | [0.96, 0.0222, 189.99] | 1,739,200 |
| 3 | [0.97, 0.0222, 189.99] | 1,732,100 |
| 4 | [0.98, 0.0222, 189.99] | 1,727,700 |
| 5 | [0.991, 0.0222, 189] | 1,724,500 |
| 6 (Final) | [0.991, 0.0222, 189] | 1,723,900 |
Final Optimized TAC: $1,723,900 (47.6% reduction from static cost analysis)
| Controller | Gain (Kc) | Integral Time (ΟI) |
|---|---|---|
| C1_CondPC | 90.6326 | 1 min |
| C2_CondPC | 73.4499 | 1 min |
| C3_CondPC | 60.0014 | 1 min |
| Controller | Gain (Kc) | Integral Time (ΟI) |
|---|---|---|
| CSTR1_TC | 14.5057 | 9.24 min |
| CSTR2_TC | 105.3682 | 11.88 min |
| C1_TopTC | 0.1133 | 11.88 min |
| C1_BotTC | 3.9789 | 7.92 min |
| C2_BotTC | 11.156 | 6.6 min |
| C3_BotTC | 83.53 | 3.96 min |
Test Cases Evaluated:
- Β±10% Fresh ethylene flowrate changes
- Β±4% Fresh ethylene composition changes
Key Performance Indicators:
- Ethyl Benzene Purity: Maintained at 99.9+ mol% despite disturbances
- Temperature Control: Stable reactor and column temperatures
- Flow Control: Effective manipulation of recycle streams
- Settling Time: < 40 hours for most disturbances
- Overshoot: Minimal for temperature and composition variables
- Steady-State Error: < 0.1% for critical process variables
| Column | Trays | Diameter (m) | Reboiler Type | Condenser Type |
|---|---|---|---|---|
| C1 | 11 | 0.6695 | Partial | Partial |
| C2 | 24 | 1.2173 | Partial | Total |
| C3 | 29 | 1.3081 | Partial | Total |
- CSTR Temperature: 150Β°C (controlled)
- Pressure: Atmospheric operation
- Heat Integration: Steam levels (HP/MP/LP) and cooling water
- Aspen Plus: Process simulation and optimization
- MATLAB: fmincon optimization algorithm implementation
- Dynamic Simulation: Controller tuning and disturbance analysis
- Sequential Sensitivity Analysis: Systematic parameter variation
- Constrained Optimization: fmincon with multiple variables
- Controller Tuning: Ziegler-Nichols and Tyreus-Luyben methods
β
47.6% TAC Reduction: From $3.29M to $1.72M annually
β
Robust Control System: Stable operation under Β±10% disturbances
β
High Product Purity: 99.9+ mol% ethyl benzene maintained
β
Energy Integration: Optimized heat exchange network
β
Economic Viability: 3-year payback period achieved
This project demonstrates comprehensive process systems engineering, combining steady-state optimization, dynamic control, and economic analysis for industrial ethyl benzene production.