Purpose
Coordinate the work required to move from the current RC7 release-candidate state to an explicit final Version 1.0 release decision.
This is a coordination and release-governance issue. It does not itself authorize code changes, documentation rewrites, release asset replacement, tag movement, or final Version 1.0 publication. Child fixes or documentation updates must remain separately scoped, reviewed, validated, and merged before this issue can be closed.
Current baseline
As of 2026-08-22:
- Current public latest release: TeknoParrot Manager v1.0 RC7
- Tag:
v1.0-RC7
- RC7 tag target:
456cc21
- Current main after post-publication roadmap/documentation governance updates:
7355dc9
- GitHub release visibility: RC7 is visible as Latest on the repository front page
- RC7 asset:
TeknoParrot.Manager.v1.0.RC7.zip
- RC7 asset size: 4,862,794 bytes
- RC7 asset SHA-256:
45D14469CF750AC14B0F4113FB4117E2DA1C80F612C335D66B61C6E3FE5ABF84
- Final
v1.0 is unpublished
Required final-publication wrap-up before 1.0 planning can be called clean
- Verify Scripts mirror contains the exact RC7 GitHub asset bytes or explicitly record if mirror publication is deferred.
- Verify mirror hash and size against the GitHub asset.
- Confirm wiki publication state and any staged wiki changes that were published.
- Run or review final stale-release wording sweep: RC7 current, RC6 historical, final v1.0 unpublished.
- Run or review attribution sweep across repo files, release notes, wiki publication notes, issue/PR/release comments where applicable.
- Confirm no tag movement, asset replacement, or hidden final v1.0 publication occurred.
Version 1.0 readiness workstream
Before final Version 1.0 can be authorized, review and classify all remaining Version 1.0 work:
- Open
release:version-1.0 issues.
- Open
release:rc-required issues.
- Open issues in Milestone 1.
- Open high/critical priority bugs.
- Open documentation/onboarding issues that affect first-time users.
- Issues whose closure status or release disposition conflicts with current evidence.
Each item must be classified as one of:
- Required before final Version 1.0.
- Defer to post-1.0 with explicit rationale and labels/milestone corrected.
- Already satisfied by merged work, with evidence and closure update required.
- Duplicate/superseded, with relationship recorded.
- Needs more evidence before a release decision.
Known items to include in the review
Post-1.0 design tracks such as #267 and #273 should remain visible in the roadmap but must not block final Version 1.0 unless an explicit current-release defect is proven.
Final Version 1.0 release gate
Final Version 1.0 requires a separate explicit approval after:
- all required pre-1.0 issues are closed or deliberately deferred;
- release notes and documentation identify final v1.0 accurately;
- package validation passes under Windows PowerShell 5.1 and PowerShell 7;
- full Quality suite passes under both PowerShell versions;
- markdown/link/release-state checks pass;
- attribution sweep is clean;
- release asset hash, size, contents, and mirror state are recorded;
- GitHub release visibility behavior is correct;
- final v1.0 tag and release plan are approved before publication.
Non-goals
- No RC7 asset replacement.
- No force-moving
v1.0-RC7.
- No final
v1.0 tag or release until explicitly authorized.
- No cabinet-control, LEDBlinky, lightgun calibration, or other post-1.0 roadmap feature implementation as part of this coordination issue.
- No broad refactor unless separately scoped and justified.
Acceptance criteria
- RC7 publication wrap-up evidence is complete or deferrals are explicit.
- All open Version 1.0 / RC-required / Milestone 1 issues are classified.
- Labels and milestones are corrected where needed.
- Required pre-1.0 work has child issues or PRs with validation evidence.
- Deferred work has clear rationale and post-1.0 tracking.
- A final Version 1.0 release checklist is ready for independent review.
- Final Version 1.0 remains unpublished until an explicit final release decision is recorded.
Purpose
Coordinate the work required to move from the current RC7 release-candidate state to an explicit final Version 1.0 release decision.
This is a coordination and release-governance issue. It does not itself authorize code changes, documentation rewrites, release asset replacement, tag movement, or final Version 1.0 publication. Child fixes or documentation updates must remain separately scoped, reviewed, validated, and merged before this issue can be closed.
Current baseline
As of 2026-08-22:
v1.0-RC7456cc217355dc9TeknoParrot.Manager.v1.0.RC7.zip45D14469CF750AC14B0F4113FB4117E2DA1C80F612C335D66B61C6E3FE5ABF84v1.0is unpublishedRequired final-publication wrap-up before 1.0 planning can be called clean
Version 1.0 readiness workstream
Before final Version 1.0 can be authorized, review and classify all remaining Version 1.0 work:
release:version-1.0issues.release:rc-requiredissues.Each item must be classified as one of:
Known items to include in the review
Post-1.0 design tracks such as #267 and #273 should remain visible in the roadmap but must not block final Version 1.0 unless an explicit current-release defect is proven.
Final Version 1.0 release gate
Final Version 1.0 requires a separate explicit approval after:
Non-goals
v1.0-RC7.v1.0tag or release until explicitly authorized.Acceptance criteria