Signed-off-by: Viwat Vchirawongkwin <viwat.v@chula.ac.th>
1 parent 55f0973 commit 0a39f4e

13 files changed

Lines changed: 33 additions & 29 deletions

‎CHANGELOG.md‎

Lines changed: 3 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -12,8 +12,9 @@ remains a separate historical baseline built from its annotated tag.
1212

1313
The merged app source now targets `0.3.0+9`. Its local Android and iPad Preview
1414
installations support scoped engineering acceptance for bounded recovery and
15-
the declared app-only matrix. Device closeout is complete; final integration and actual channel
16-
delivery remain separate. The recorded existing-channel baseline is Android
15+
the declared app-only matrix. Device closeout is complete. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final
16+
integration; required CI and merge precede publishing. Actual channel delivery
17+
remains pending. The recorded existing-channel baseline is Android
1718
Play `0.2.0 (8)` and iPad TestFlight `0.2.0 (6)`; the earlier build-5 Transporter
1819
and build-8 submission handoffs remain historical artifact records.
1920

‎docs/ROADMAP.md‎

Lines changed: 3 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -44,8 +44,9 @@ v0.7.0 remains non-normative and requires separate maintainer approval.
4444
estimate remains a forecast, not measured effort.
4545
- Correct the [stale public TestFlight description](developments/2026-q4-reliable-workflow/c1-s1/05_TestFlight_Metadata_Correction.md)
4646
through the distribution owner; replacement copy is prepared, not published.
47-
- Complete [final integration and channel delivery](developments/2026-q4-reliable-workflow/c1-s2/06_Release_Readiness.md) for qualified app `0.3.0+9`,
48-
retaining the recorded 0.2.0 channel baseline until the new channel is verified. The
47+
- Complete [channel delivery](developments/2026-q4-reliable-workflow/c1-s2/06_Release_Readiness.md) for qualified app `0.3.0+9`.
48+
[PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final integration; required CI and merge precede publishing.
49+
Retain the recorded 0.2.0 channel baseline until the new channel is verified. The
4950
[Android publication review](testing/website/android-open-testing-2026-09-25.md)
5051
records live open-testing availability. The
5152
[prepared build-8 handoff](testing/google-play/0.2.0-build-8.md) remains a

‎docs/decisions/0010-working-loop-in-memory-document.md‎

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -70,6 +70,6 @@ That 25 September inspection was design-only. The 31 October candidate now
7070
implements the bounded current-text successor; its
7171
[C1-S2 execution record](../developments/2026-q4-reliable-workflow/c1-s2/00_Execution_Record.md)
7272
records scoped engineering acceptance after integrated/physical checks, with
73-
exact test conditions and completed device closeout; final integration and
74-
channel delivery remain separate. The remaining A-24 project, settings, console, import and
73+
exact test conditions and completed device closeout. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final
74+
integration; required CI and merge precede publishing. Channel delivery remains pending. The remaining A-24 project, settings, console, import and
7575
Blocks obligations remain carried.

‎docs/decisions/0048-bounded-current-text-draft-recovery.md‎

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -8,8 +8,8 @@
88
2026-09-25 during C1-S1. PR #40 merged the source and integrated CI passes.
99
Scoped recovery acceptance and app-only qualification are recorded for frozen
1010
runtime `bef67bd` after required automated and physical checks. Device closeout
11-
is complete; final branch integration and channel delivery remain separate; no
12-
named human sign-off is claimed.
11+
is complete. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final integration; required CI and merge precede
12+
publishing. Channel delivery remains pending; no named human sign-off is claimed.
1313

1414
## Context
1515

‎docs/developments/2026-q4-reliable-workflow/01_Overview_and_Scrum_Framework.md‎

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -18,7 +18,7 @@
1818

1919
This package derives execution views from the strategy. It does not replace normative specifications, expand hardware claims, create GitHub issues, or authorize store/website publication. The strategy and original package were recorded together in planning baseline `d039db0`. The [C1-S1 execution record](c1-s1/00_Execution_Record.md) owns actual results and blockers.
2020

21-
**31 October acceptance update:** scoped current-text recovery (PYB-006.2 / M-02) and the app-only M-04 candidate pass engineering review at `bef67bd`: 984 ordinary tests, 36 frozen-runtime CI checks, both-platform recovery/keyboard evidence and all ten declared app/profile rows. The [C1-S2 record](c1-s2/00_Execution_Record.md) preserves exact artifacts, firmware baselines, earlier-row impact assessments and the temporary Android qualifier battery-policy condition. Signed packages and the release packet are prepared; original device policy and normal board advertising are restored, and owned fixtures are cleaned. Final branch integration and actual M-05 store delivery remain separate. S1 remains six Done / two Prepared / four Awaiting evidence; S2 has ten engineering tasks Done and participant follow-up unfinished. Original dates/hours remain the baseline; the [continuation plan](04_Sprint_Plan.md#31-october-continuation-order-and-reforecast) records the next work and unresolved human capacity.
21+
**31 October acceptance update:** scoped current-text recovery (PYB-006.2 / M-02) and the app-only M-04 candidate pass engineering review at `bef67bd`: 984 ordinary tests, 36 frozen-runtime CI checks, both-platform recovery/keyboard evidence and all ten declared app/profile rows. The [C1-S2 record](c1-s2/00_Execution_Record.md) preserves exact artifacts, firmware baselines, earlier-row impact assessments and the temporary Android qualifier battery-policy condition. Signed packages and the release packet are prepared; original device policy and normal board advertising are restored, and owned fixtures are cleaned. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final integration; required CI and merge precede publishing. Actual M-05 store delivery remains pending. S1 remains six Done / two Prepared / four Awaiting evidence; S2 has ten engineering tasks Done and participant follow-up unfinished. Original dates/hours remain the baseline; the [continuation plan](04_Sprint_Plan.md#31-october-continuation-order-and-reforecast) records the next work and unresolved human capacity.
2222

2323
## Navigation and ownership of information
2424

‎docs/developments/2026-q4-reliable-workflow/02_Product_Roadmap.md‎

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -5,15 +5,15 @@
55

66
| Control | Value |
77
|---|---|
8-
| Status | C1-S1 remains partial; bounded recovery and app-only qualification pass 31 October engineering review. Next release work is final integration and M-05 delivery; pilot/capacity inputs remain outstanding |
8+
| Status | C1-S1 remains partial; bounded recovery and app-only qualification pass 31 October engineering review. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final integration; required CI and merge precede publishing. M-05 delivery and pilot/capacity inputs remain outstanding |
99
| Planning date | 25 September 2026; dates use Asia/Bangkok |
1010
| Source | [Implementation strategy revision 1.8](../../planning/PyBLE_Implementation_Plan_and_Strategy_v1.0.md), particularly §§1, 6–9, 12, 14, and 19 |
1111
| Inspected baseline | `main` at `23ed764b0ef88dce9720c66fbd1c0655268860cf` |
1212
| First cycle | C1: 28 September–20 December 2026; later horizons conditional through September 2028 |
1313
| Planning authority | Product Owner orders the Product Backlog; Developers forecast feasible work during Sprint Planning; names and capacity remain unassigned |
1414
| Related documents | [Framework](01_Overview_and_Scrum_Framework.md), [milestones](03_Milestones.md), [Sprint Plan](04_Sprint_Plan.md), [stories](05_Product_Backlog_and_Stories.md), [Sprint Backlogs](06_Sprint_Backlogs.md) |
1515

16-
**31 October acceptance update:** scoped current-text recovery (PYB-006.2 / M-02) and the app-only M-04 candidate pass engineering review at `bef67bd`: 984 ordinary tests, 36 frozen-runtime CI checks, both-platform recovery/keyboard evidence and all ten declared app/profile rows. The [C1-S2 record](c1-s2/00_Execution_Record.md) preserves exact artifacts, firmware baselines, earlier-row impact assessments and the temporary Android qualifier battery-policy condition. Signed packages and the release packet are prepared; original device policy and normal board advertising are restored, and owned fixtures are cleaned. Final branch integration and actual M-05 store delivery remain separate. S1 remains six Done / two Prepared / four Awaiting evidence; S2 has ten engineering tasks Done and participant follow-up unfinished. Original dates/hours remain the baseline; the [continuation plan](04_Sprint_Plan.md#31-october-continuation-order-and-reforecast) records the next work and unresolved human capacity.
16+
**31 October acceptance update:** scoped current-text recovery (PYB-006.2 / M-02) and the app-only M-04 candidate pass engineering review at `bef67bd`: 984 ordinary tests, 36 frozen-runtime CI checks, both-platform recovery/keyboard evidence and all ten declared app/profile rows. The [C1-S2 record](c1-s2/00_Execution_Record.md) preserves exact artifacts, firmware baselines, earlier-row impact assessments and the temporary Android qualifier battery-policy condition. Signed packages and the release packet are prepared; original device policy and normal board advertising are restored, and owned fixtures are cleaned. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final integration; required CI and merge precede publishing. Actual M-05 store delivery remains pending. S1 remains six Done / two Prepared / four Awaiting evidence; S2 has ten engineering tasks Done and participant follow-up unfinished. Original dates/hours remain the baseline; the [continuation plan](04_Sprint_Plan.md#31-october-continuation-order-and-reforecast) records the next work and unresolved human capacity.
1717

1818
## Product Goal and decision principle
1919

‎docs/developments/2026-q4-reliable-workflow/03_Milestones.md‎

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -5,14 +5,14 @@
55

66
| Control | Value |
77
|---|---|
8-
| Status | M-01/SG0 remains Blocked on 25 September by pilot ownership/cohort/setup and capacity decisions; existing channel installations verified on retry. M-02 and scoped app-only M-04 pass 31 October engineering review; device closeout is complete, while final integration and M-05 channel delivery remain pending; forecast windows need replanning |
8+
| Status | M-01/SG0 remains Blocked on 25 September by pilot ownership/cohort/setup and capacity decisions; existing channel installations verified on retry. M-02 and scoped app-only M-04 pass 31 October engineering review; device closeout is complete. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final integration; required CI and merge precede publishing. M-05 channel delivery remains pending; forecast windows need replanning |
99
| Planning date | 25 September 2026; dates use Asia/Bangkok |
1010
| Source | [Implementation strategy revision 1.8](../../planning/PyBLE_Implementation_Plan_and_Strategy_v1.0.md), especially §§4, 8–10, 14, and 19 |
1111
| Inspected baseline | `main` at `23ed764b0ef88dce9720c66fbd1c0655268860cf` |
1212
| Related documents | [Framework](01_Overview_and_Scrum_Framework.md), [roadmap](02_Product_Roadmap.md), [Sprint Plan](04_Sprint_Plan.md), [stories](05_Product_Backlog_and_Stories.md), [Sprint Backlogs](06_Sprint_Backlogs.md) |
1313
| Meaning | Milestones describe inspectable outcomes and decision evidence; they are not additional Scrum events or promised releases |
1414

15-
**31 October acceptance update:** scoped current-text recovery (PYB-006.2 / M-02) and the app-only M-04 candidate pass engineering review at `bef67bd`: 984 ordinary tests, 36 frozen-runtime CI checks, both-platform recovery/keyboard evidence and all ten declared app/profile rows. The [C1-S2 record](c1-s2/00_Execution_Record.md) preserves exact artifacts, firmware baselines, earlier-row impact assessments and the temporary Android qualifier battery-policy condition. Signed packages and the release packet are prepared; original device policy and normal board advertising are restored, and owned fixtures are cleaned. Final branch integration and actual M-05 store delivery remain separate. S1 remains six Done / two Prepared / four Awaiting evidence; S2 has ten engineering tasks Done and participant follow-up unfinished. Original dates/hours remain the baseline; the [continuation plan](04_Sprint_Plan.md#31-october-continuation-order-and-reforecast) records the next work and unresolved human capacity.
15+
**31 October acceptance update:** scoped current-text recovery (PYB-006.2 / M-02) and the app-only M-04 candidate pass engineering review at `bef67bd`: 984 ordinary tests, 36 frozen-runtime CI checks, both-platform recovery/keyboard evidence and all ten declared app/profile rows. The [C1-S2 record](c1-s2/00_Execution_Record.md) preserves exact artifacts, firmware baselines, earlier-row impact assessments and the temporary Android qualifier battery-policy condition. Signed packages and the release packet are prepared; original device policy and normal board advertising are restored, and owned fixtures are cleaned. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final integration; required CI and merge precede publishing. Actual M-05 store delivery remains pending. S1 remains six Done / two Prepared / four Awaiting evidence; S2 has ten engineering tasks Done and participant follow-up unfinished. Original dates/hours remain the baseline; the [continuation plan](04_Sprint_Plan.md#31-october-continuation-order-and-reforecast) records the next work and unresolved human capacity.
1616

1717
## Assessment and evidence states
1818

‎docs/developments/2026-q4-reliable-workflow/04_Sprint_Plan.md‎

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -12,7 +12,7 @@
1212
| Acceptance criteria | [Product backlog and stories](05_Product_Backlog_and_Stories.md) |
1313
| Task-level proposal | [Sprint backlogs](06_Sprint_Backlogs.md) |
1414

15-
**31 October acceptance update:** scoped current-text recovery (PYB-006.2 / M-02) and the app-only M-04 candidate pass engineering review at `bef67bd`: 984 ordinary tests, 36 frozen-runtime CI checks, both-platform recovery/keyboard evidence and all ten declared app/profile rows. The [C1-S2 record](c1-s2/00_Execution_Record.md) preserves exact artifacts, firmware baselines, earlier-row impact assessments and the temporary Android qualifier battery-policy condition. Signed packages and the release packet are prepared; original device policy and normal board advertising are restored, and owned fixtures are cleaned. Final branch integration and actual M-05 store delivery remain separate. S1 remains six Done / two Prepared / four Awaiting evidence; S2 has ten engineering tasks Done and participant follow-up unfinished. Original dates/hours remain the baseline; the [continuation plan](04_Sprint_Plan.md#31-october-continuation-order-and-reforecast) records the next work and unresolved human capacity.
15+
**31 October acceptance update:** scoped current-text recovery (PYB-006.2 / M-02) and the app-only M-04 candidate pass engineering review at `bef67bd`: 984 ordinary tests, 36 frozen-runtime CI checks, both-platform recovery/keyboard evidence and all ten declared app/profile rows. The [C1-S2 record](c1-s2/00_Execution_Record.md) preserves exact artifacts, firmware baselines, earlier-row impact assessments and the temporary Android qualifier battery-policy condition. Signed packages and the release packet are prepared; original device policy and normal board advertising are restored, and owned fixtures are cleaned. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final integration; required CI and merge precede publishing. Actual M-05 store delivery remains pending. S1 remains six Done / two Prepared / four Awaiting evidence; S2 has ten engineering tasks Done and participant follow-up unfinished. Original dates/hours remain the baseline; the [continuation plan](04_Sprint_Plan.md#31-october-continuation-order-and-reforecast) records the next work and unresolved human capacity.
1616

1717
## Forecast and commitment boundary
1818

‎docs/developments/2026-q4-reliable-workflow/05_Product_Backlog_and_Stories.md‎

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -9,11 +9,11 @@
99
| Source | [Implementation strategy revision 1.8](../../planning/PyBLE_Implementation_Plan_and_Strategy_v1.0.md), initially derived 25 September; reconciled 31 October 2026 |
1010
| Cycle | Proposed 28 September–20 December 2026; Asia/Bangkok |
1111
| Baseline | `23ed764b0ef88dce9720c66fbd1c0655268860cf`; completed publication work is evidence, not a new commitment |
12-
| Status | C1-S1: PYB-001.1/.2 and PYB-006.1 scoped work Done; pilot preparation awaits setup and observation work awaits evidence. PYB-006.2/M-02, scoped 008/009 and app-only M-04 pass engineering review; final integration and M-05 delivery remain separate |
12+
| Status | C1-S1: PYB-001.1/.2 and PYB-006.1 scoped work Done; pilot preparation awaits setup and observation work awaits evidence. PYB-006.2/M-02, scoped 008/009 and app-only M-04 pass engineering review; [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final integration; required CI and merge precede publishing. M-05 delivery remains pending |
1313
| Accountabilities | Product Owner orders the backlog; Developers size and select work in Sprint Planning; named people and capacity remain to be assigned |
1414
| Navigation | [Overview and Scrum](01_Overview_and_Scrum_Framework.md) · [Roadmap](02_Product_Roadmap.md) · [Milestones](03_Milestones.md) · [Sprint plan](04_Sprint_Plan.md) · [Sprint Backlogs](06_Sprint_Backlogs.md) |
1515

16-
**31 October acceptance update:** scoped current-text recovery (PYB-006.2 / M-02) and the app-only M-04 candidate pass engineering review at `bef67bd`: 984 ordinary tests, 36 frozen-runtime CI checks, both-platform recovery/keyboard evidence and all ten declared app/profile rows. The [C1-S2 record](c1-s2/00_Execution_Record.md) preserves exact artifacts, firmware baselines, earlier-row impact assessments and the temporary Android qualifier battery-policy condition. Signed packages and the release packet are prepared; original device policy and normal board advertising are restored, and owned fixtures are cleaned. Final branch integration and actual M-05 store delivery remain separate. S1 remains six Done / two Prepared / four Awaiting evidence; S2 has ten engineering tasks Done and participant follow-up unfinished. Original dates/hours remain the baseline; the [continuation plan](04_Sprint_Plan.md#31-october-continuation-order-and-reforecast) records the next work and unresolved human capacity.
16+
**31 October acceptance update:** scoped current-text recovery (PYB-006.2 / M-02) and the app-only M-04 candidate pass engineering review at `bef67bd`: 984 ordinary tests, 36 frozen-runtime CI checks, both-platform recovery/keyboard evidence and all ten declared app/profile rows. The [C1-S2 record](c1-s2/00_Execution_Record.md) preserves exact artifacts, firmware baselines, earlier-row impact assessments and the temporary Android qualifier battery-policy condition. Signed packages and the release packet are prepared; original device policy and normal board advertising are restored, and owned fixtures are cleaned. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final integration; required CI and merge precede publishing. Actual M-05 store delivery remains pending. S1 remains six Done / two Prepared / four Awaiting evidence; S2 has ten engineering tasks Done and participant follow-up unfinished. Original dates/hours remain the baseline; the [continuation plan](04_Sprint_Plan.md#31-october-continuation-order-and-reforecast) records the next work and unresolved human capacity.
1717

1818
## 1. How to use this backlog
1919

0 commit comments

Comments