Commit 8dde8d6
Browse filesBrowse the repository at this point in the historyBrowse files
| Proposed cycle | 28 September–20 December 2026; six two-week Sprints |
15
-
| Status | C1-S1 execution initiated on 25 September; repository deliverables prepared and physical/pilot work blocked. Later Sprints require replanning against new sizing; no staffed-team ceremony is inferred |
15
+
| Status | C1-S1 device retry on 25 September: six tasks Done, two Prepared and four Awaiting evidence; both current channel installations verified, pilot work unfinished. Later Sprints require replanning against new sizing; no staffed-team ceremony is inferred |
16
16
| Primary audience | Tablet-owning makers, provisionally; confirm one reachable cohort before observation |
Goal --> Roadmap["Outcome roadmap and milestones"]
37
37
Roadmap --> Product["Ordered Product Backlog"]
38
38
Product --> Planning["Sprint Planning"]
@@ -58,7 +58,7 @@ flowchart LR
58
58
| Baseline fact | Consequence |
59
59
|---|---|
60
60
| Android open-testing copy correction is complete in PR #33| Do not replan that correction; identify any new discrepancy separately |
61
-
| App source is `0.2.0+8`; Play publicly identifies `0.2.0`; iPad remains external TestFlight beta | Source version does not prove the installed store binary or its source commit|
61
+
| App source is `0.2.0+8`; physical retry verifies Play `0.2.0 (8)` and TestFlight `0.2.0 (6)`| Android payloads map to the historical build-8 bundle; iPad source mapping remains unknown. Neither channel check proves BLE or older-OS compatibility|
62
62
| Firmware v0.6.1 is published on owner confirmation across five exact profiles | Pending automated results stay pending; no automatic PyBLE Ready badge |
63
63
| Issue #24 is closed/superseded | Do not resurrect its old release umbrella as a dependency |
64
64
| Editor draft is volatile under [ADR-0010](../../decisions/0010-working-loop-in-memory-document.md)| Close an accepted subset of A-24; do not claim full project persistence or Blocks recovery |
@@ -107,7 +107,7 @@ Readiness is a local refinement aid. It does not replace Sprint Planning or add
107
107
| Claims have evidence | Exact artifacts, pass/fail/not-run states, limitations and pending release work recorded truthfully |
108
108
| Documentation/discovery scope is complete | Usable reviewed record/guide or agreed findings, source/link checks, and explicit unmet targets; no invented physical results |
109
109
110
-
This is the proposed package-wide minimum; accepted normative requirements remain binding. Apply it to the selected item rather than treating a source merge as a finished feature. A documentation or discovery item can be Done with a negative finding, while a required physical-installation task cannot be Done if no installation happened. A usable Sprint 1 documentation increment should help an operator or user perform the current workflow; an internal plan alone is not evidence of improved app behavior.
110
+
This is the proposed package-wide minimum; accepted normative requirements remain binding. Apply it to the selected item rather than treating a source merge as a finished feature. A documentation or discovery item can be Done with a negative finding, while a required channel-installation verification task needs observed installation identity, origin and launch; verifying an existing installation does not imply a fresh install. A usable Sprint 1 documentation increment should help an operator or user perform the current workflow; an internal plan alone is not evidence of improved app behavior.
111
111
112
112
| State distinction | Meaning |
113
113
|---|---|
@@ -128,7 +128,7 @@ Unfinished items return to the Product Backlog for reordering and replanning. Do
128
128
|`C1-S1` … `C1-S6`| This cycle's Sprints; distinct from historical App TDD Sprint labels |
129
129
|`C1-S1-T01`, etc. | Task identities with recorded early C1-S1 outcomes; later task rows remain forecasts, not new public contracts |
130
130
|`M-01`, etc.; `SG0` … `SG6`| Delivery milestones versus strategy gates; neither replaces CI G0/G1 or C3 firmware gates |
131
-
| Item/task status | Proposed → Selected at Planning → In progress → Review → Done; Blocked records a reason/owner; later forecasts remain Proposed |
131
+
| Item/task status | Proposed → Selected at Planning → In progress → Review → Done. Prepared means a reviewed partial deliverable; Awaiting evidence identifies an unperformed observation/session. Both remain unfinished. Blocked names a concrete impediment/owner; later forecasts remain Proposed |
132
132
| Private versus public records | Contact/consent, device identifiers and raw logs remain private/ignored; publish only reviewed aggregate findings and redacted evidence |
133
133
134
134
When facts or priority change, update the canonical file above and its dependent tables together. Preserve old evidence and dated decisions. New opcode/capability values, hardware support, Ready awards, and publication need their normal specification and authorization paths; none is inferred from this package.
@@ -137,9 +137,9 @@ When facts or priority change, update the canonical file above and its dependent
137
137
138
138
| Source | Use and precedence |
139
139
|---|---|
140
-
|[Strategy revision 1.3](../../planning/PyBLE_Implementation_Plan_and_Strategy_v1.0.md)| Scope, targets, six-Sprint capacity, three outcomes, Ready program and conditional horizons |
140
+
|[Strategy revision 1.4](../../planning/PyBLE_Implementation_Plan_and_Strategy_v1.0.md)| Scope, targets, six-Sprint capacity, three outcomes, Ready program and conditional horizons |
141
141
|[Public roadmap](../../ROADMAP.md), [README](../../../README.md)| Current capability and distribution baseline |
142
142
|[App specification](../../specifications/App/specs.md), [App TDD](../../specifications/App/TDD.md), [ADR-0010](../../decisions/0010-working-loop-in-memory-document.md)| Persistence contract and recorded implementation deviation; consult frozen working-loop scope |
143
143
|[Firmware roadmap](../../planning/firmware-v0.6.1-v0.7.0-roadmap.md), [PBLE/1](../../specifications/protocol.md)| v0.7 proposals versus frozen wire behavior; old v0.6.1 publication/#24 wording is historical |
144
-
|[Android publication review](../../testing/website/android-open-testing-2026-09-25.md), [v0.6.1 publication record](../../testing/firmware-v0.6.1-publication-2026-09-11.md)| Dated evidence; neither establishes a newly installed binary or missing automated qualification |
144
+
|[Android publication review](../../testing/website/android-open-testing-2026-09-25.md), [v0.6.1 publication record](../../testing/firmware-v0.6.1-publication-2026-09-11.md)| Dated publication evidence, separate from the new [Android](c1-s1/06_Android_Channel_Verification.md) and [iPad](c1-s1/07_iPad_Channel_Verification.md) existing-installation checks; missing automated qualification remains unfinished|
145
145
|[HIL guide](../../../tests/firmware_tests/hil/README.md), [CI workflow](../../../.github/workflows/ci.yml), [CONTRIBUTING](../../../CONTRIBUTING.md)| Reuse existing tools and gates; actual CI requirements govern merges |
Copy file name to clipboardExpand all lines: docs/developments/2026-q4-reliable-workflow/06_Sprint_Backlogs.md
+15-10Lines changed: 15 additions & 10 deletions
Display the source diff
Display the rich diff
Original file line number
Diff line number
Diff line change
@@ -5,13 +5,13 @@
5
5
6
6
| Field | Rule |
7
7
|---|---|
8
-
| Status | C1-S1 execution initiated 25 September: four repository tasks Done, eight device/pilot tasks Blocked. C1-S2–C1-S6 retain original Proposed allowances and require replanning before selection |
8
+
| Status | C1-S1 device retry 25 September: six tasks Done, two Prepared and four Awaiting evidence. Both current channel installations verified; participant-dependent work remains unfinished. C1-S2–C1-S6 retain original Proposed allowances and require replanning before selection |
9
9
| Product/Sprint Goals |[Framework](01_Overview_and_Scrum_Framework.md) and [Sprint plan](04_Sprint_Plan.md)|
10
10
| Acceptance authority |[Product backlog and stories](05_Product_Backlog_and_Stories.md); task completion never overrides a parent story's acceptance criteria |
11
11
| Selection | Developers confirm scope, ownership, estimates and task plan at each Sprint Planning |
12
12
| Hours | Initial task allowances totaling the source plan's 136 hours; not story points or validated effort estimates |
13
13
| Dependencies | Same-Sprint `Txx` references refer to that Sprint's task. Cross-Sprint dependencies name their full item/task ID |
14
-
| Evidence | Record artifact identity and actual results; unavailable access/recruitment leaves the affected task Blocked, not Done |
14
+
| Evidence | Record artifact identity and actual results; use Prepared for reviewed partial work, Awaiting evidence for unperformed sessions/observations, and Blocked for a concrete impediment with an owner; unfinished work is never Done |
15
15
| Privacy | Keep private consent/contact/device records outside Git; link only reviewed public aggregates and redacted evidence |
16
16
17
17
Actual task evidence and blocker owners are maintained in the [C1-S1 execution record](c1-s1/00_Execution_Record.md). The original future task tables below are retained as the baseline; the new 45–72h recovery estimate and matrix cost model invalidate their assumed fit. Use the [reforecast requirements](04_Sprint_Plan.md#c1-s1-findings-and-required-reforecast) before selection. Prepared TestFlight correction copy records residual PYB-002.1; its external application is not an extra committed task.
@@ -33,19 +33,21 @@ Record optional follow-up consent and the prospective day-7–14 window at each
33
33
| Task ID | Parent child item | Proposed task and expected output | Dependency | Contribution role | h | Status |
34
34
|---|---|---|---|---|---:|---|
35
35
| C1-S1-T01 | PYB-001.1 | Assemble the dated channel/install/provenance/qualification ledger from existing records; assign unresolved fields | Current source/publication records | Release | 1 | Done |
36
-
| C1-S1-T02 | PYB-001.2 | Verify eligible Android enrollment/install and record build/version, restrictions and available source mapping | T01; Play/device access | Release + QA | 2 |Blocked|
37
-
| C1-S1-T03 | PYB-001.2 | Verify current TestFlight installation and record its actual build and provenance limitations | T01; TestFlight/device access | Release + QA | 2 |Blocked|
38
-
| C1-S1-T04 | PYB-003.1 | Review harmless hardware/pilot boundaries, consent/retention rules, and manual support template | Recorded pilot setup; named pilot owner | Pilot + QA | 2 |Blocked|
39
-
| C1-S1-T05 | PYB-004.1 | Confirm primary cohort and Tasks A/B/C, assistance/timeout rules, previous workflow and prospective follow-up | T04; recorded app/setup | Pilot | 2 |Blocked|
40
-
| C1-S1-T06 | PYB-004.2 / PYB-011.2 | Observe the first baseline batch; record every eligible start, assistance, consent/window and any due follow-up | T05; consenting participants | Pilot | 2 |Blocked|
41
-
| C1-S1-T07 | PYB-004.2 / PYB-011.2 | Observe the next baseline batch under the same task/build rules; record windows and collect due follow-up | T05; consenting participants | Pilot | 2 |Blocked|
| C1-S1-T09 | PYB-004.2 | Summarize baseline outcomes and actual observation cost; identify an observed obstacle without inventing one | T06–T08 actual records | Pilot + Product Owner | 1 |Blocked|
36
+
| C1-S1-T02 | PYB-001.2 | Verify eligible Android enrollment/current installation and record build/version, restrictions and available source mapping | T01; Play/device access | Release + QA | 2 |Done|
37
+
| C1-S1-T03 | PYB-001.2 | Verify current TestFlight installation and record its actual build and provenance limitations | T01; TestFlight/device access | Release + QA | 2 |Done|
38
+
| C1-S1-T04 | PYB-003.1 | Review harmless hardware/pilot boundaries, consent/retention rules, and manual support template | Recorded pilot setup; named pilot owner | Pilot + QA | 2 |Prepared — awaiting pilot setup|
39
+
| C1-S1-T05 | PYB-004.1 | Confirm primary cohort and Tasks A/B/C, assistance/timeout rules, previous workflow and prospective follow-up | T04; recorded app/setup | Pilot | 2 |Prepared — awaiting pilot setup|
40
+
| C1-S1-T06 | PYB-004.2 / PYB-011.2 | Observe the first baseline batch; record every eligible start, assistance, consent/window and any due follow-up | T05; consenting participants | Pilot | 2 |Awaiting participant sessions|
41
+
| C1-S1-T07 | PYB-004.2 / PYB-011.2 | Observe the next baseline batch under the same task/build rules; record windows and collect due follow-up | T05; consenting participants | Pilot | 2 |Awaiting participant sessions|
| C1-S1-T09 | PYB-004.2 | Summarize baseline outcomes and actual observation cost; identify an observed obstacle without inventing one | T06–T08 actual records | Pilot + Product Owner | 1 |Awaiting observation records|
44
44
| C1-S1-T10 | PYB-006.1 | Draft the bounded Drift recovery contract: write boundary, restore/discard, board association, failure handling and carried Blocks/A-24 scope | ADR-0010 and App contracts; no recruitment dependency | App | 3 | Done |
45
45
| C1-S1-T11 | PYB-006.1 | Review acceptance scenarios and size the safe increment including required tests; record approval or unresolved design questions | T10; review path | App + reviewer | 1 | Done |
46
46
| C1-S1-T12 | PYB-009.1 | Inventory existing suites, hardware/operators, applicable gates and matrix cost; draft the next operator recipe | T01 and current tools/specs | QA + firmware | 2 | Done |
47
47
|**C1-S1 total**|||||**22**||
48
48
49
+
T02/T03 verified existing Play `0.2.0 (8)` and TestFlight `0.2.0 (6)` installations, origin and launch using the ledger checklist; no fresh enrollment, reinstall or upgrade was performed. Platform reports retain provenance and minimum-OS limitations. T04/T05 have completed source QA but still need the named pilot owner, cohort and tested reference setup.
50
+
49
51
Five baseline starts is a target, not the implied result of reserving six hours. If access or session duration prevents it, report the actual sample and replan. A completed findings record does not mark an unperformed installation or observation task Done. Missing store source mapping remains an owned limitation under the applicable gate.
50
52
51
53
## C1-S2 — deliver a bounded safe recovery increment
@@ -208,10 +210,13 @@ flowchart LR
208
210
S --> W["In progress"]
209
211
W --> R["Review evidence and acceptance"]
210
212
R --> D["Done task; assess parent separately"]
213
+
R --> A["Prepared or awaiting evidence; unfinished"]