[docs] align release summaries with merge and Apple upload
Signed-off-by: Viwat Vchirawongkwin <viwat.v@chula.ac.th>
1 parent 4c904ec commit d7c3c3c

10 files changed

Lines changed: 29 additions & 27 deletions

‎CHANGELOG.md‎

Lines changed: 3 additions & 3 deletions
Original file line numberDiff line numberDiff line change
@@ -12,9 +12,9 @@ remains a separate historical baseline built from its annotated tag.
1212

1313
The merged app source now targets `0.3.0+9`. Its local Android and iPad Preview
1414
installations support scoped engineering acceptance for bounded recovery and
15-
the declared app-only matrix. Device closeout is complete. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final
16-
integration; required CI and merge precede publishing. Actual channel delivery
17-
remains pending. The recorded existing-channel baseline is Android
15+
the declared app-only matrix. Device closeout is complete. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) merged after all 36 checks on its final head passed. Apple accepted the
16+
`0.3.0 (9)` upload and started processing; the [receipt](docs/developments/2026-q4-reliable-workflow/c1-s2/06_Release_Readiness.md#31-october-app-store-connect-upload-receipt)
17+
does not establish TestFlight delivery. Actual channel delivery remains pending. The recorded existing-channel baseline is Android
1818
Play `0.2.0 (8)` and iPad TestFlight `0.2.0 (6)`; the earlier build-5 Transporter
1919
and build-8 submission handoffs remain historical artifact records.
2020

‎README.md‎

Lines changed: 4 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -108,8 +108,10 @@ for accepted automated and candidate-specific device evidence, including the
108108
declared five-profile × two-platform app matrix and test conditions. Local
109109
Android and iPad Preview installations remain separate from store delivery.
110110
The [release readiness record](docs/developments/2026-q4-reliable-workflow/c1-s2/06_Release_Readiness.md)
111-
tracks the engineering-qualified artifacts, completed device closeout and channel handoff;
112-
`0.3.0 (9)` is not yet established as a store-delivered update.
111+
tracks the engineering-qualified artifacts, completed device closeout and channel handoff.
112+
Apple accepted the `0.3.0 (9)` upload and started processing ([receipt](docs/developments/2026-q4-reliable-workflow/c1-s2/06_Release_Readiness.md#31-october-app-store-connect-upload-receipt));
113+
TestFlight delivery and Google Play submission remain unverified. This candidate
114+
is not yet established as a store-delivered update.
113115

114116
### Firmware
115117

‎docs/ROADMAP.md‎

Lines changed: 2 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -45,7 +45,8 @@ v0.7.0 remains non-normative and requires separate maintainer approval.
4545
- Correct the [stale public TestFlight description](developments/2026-q4-reliable-workflow/c1-s1/05_TestFlight_Metadata_Correction.md)
4646
through the distribution owner; replacement copy is prepared, not published.
4747
- Complete [channel delivery](developments/2026-q4-reliable-workflow/c1-s2/06_Release_Readiness.md) for qualified app `0.3.0+9`.
48-
[PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final integration; required CI and merge precede publishing.
48+
[PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) merged after all 36 checks on its final head passed.
49+
Apple accepted the upload and started processing ([receipt](developments/2026-q4-reliable-workflow/c1-s2/06_Release_Readiness.md#31-october-app-store-connect-upload-receipt)); TestFlight delivery and Google Play submission remain unverified.
4950
Retain the recorded 0.2.0 channel baseline until the new channel is verified. The
5051
[Android publication review](testing/website/android-open-testing-2026-09-25.md)
5152
records live open-testing availability. The

‎docs/developments/2026-q4-reliable-workflow/01_Overview_and_Scrum_Framework.md‎

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -18,7 +18,7 @@
1818

1919
This package derives execution views from the strategy. It does not replace normative specifications, expand hardware claims, create GitHub issues, or authorize store/website publication. The strategy and original package were recorded together in planning baseline `d039db0`. The [C1-S1 execution record](c1-s1/00_Execution_Record.md) owns actual results and blockers.
2020

21-
**31 October acceptance update:** scoped current-text recovery (PYB-006.2 / M-02) and the app-only M-04 candidate pass engineering review at `bef67bd`: 984 ordinary tests, 36 frozen-runtime CI checks, both-platform recovery/keyboard evidence and all ten declared app/profile rows. The [C1-S2 record](c1-s2/00_Execution_Record.md) preserves exact artifacts, firmware baselines, earlier-row impact assessments and the temporary Android qualifier battery-policy condition. Signed packages and the release packet are prepared; original device policy and normal board advertising are restored, and owned fixtures are cleaned. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final integration; required CI and merge precede publishing. Actual M-05 store delivery remains pending. S1 remains six Done / two Prepared / four Awaiting evidence; S2 has ten engineering tasks Done and participant follow-up unfinished. Original dates/hours remain the baseline; the [continuation plan](04_Sprint_Plan.md#31-october-continuation-order-and-reforecast) records the next work and unresolved human capacity.
21+
**31 October acceptance update:** scoped current-text recovery (PYB-006.2 / M-02) and the app-only M-04 candidate pass engineering review at `bef67bd`: 984 ordinary tests, 36 frozen-runtime CI checks, both-platform recovery/keyboard evidence and all ten declared app/profile rows. The [C1-S2 record](c1-s2/00_Execution_Record.md) preserves exact artifacts, firmware baselines, earlier-row impact assessments and the temporary Android qualifier battery-policy condition. Signed packages and the release packet are prepared; original device policy and normal board advertising are restored, and owned fixtures are cleaned. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) merged after all 36 checks on its final head passed. Apple accepted the upload and started processing ([receipt](c1-s2/06_Release_Readiness.md#31-october-app-store-connect-upload-receipt)); actual M-05 store delivery remains pending. S1 remains six Done / two Prepared / four Awaiting evidence; S2 has ten engineering tasks Done and participant follow-up unfinished. Original dates/hours remain the baseline; the [continuation plan](04_Sprint_Plan.md#31-october-continuation-order-and-reforecast) records the next work and unresolved human capacity.
2222

2323
## Navigation and ownership of information
2424

‎docs/developments/2026-q4-reliable-workflow/02_Product_Roadmap.md‎

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -5,15 +5,15 @@
55

66
| Control | Value |
77
|---|---|
8-
| Status | C1-S1 remains partial; bounded recovery and app-only qualification pass 31 October engineering review. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final integration; required CI and merge precede publishing. M-05 delivery and pilot/capacity inputs remain outstanding |
8+
| Status | C1-S1 remains partial; bounded recovery and app-only qualification pass 31 October engineering review. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) merged after all 36 checks on its final head passed. M-05 delivery and pilot/capacity inputs remain outstanding |
99
| Planning date | 25 September 2026; dates use Asia/Bangkok |
1010
| Source | [Implementation strategy revision 1.8](../../planning/PyBLE_Implementation_Plan_and_Strategy_v1.0.md), particularly §§1, 6–9, 12, 14, and 19 |
1111
| Inspected baseline | `main` at `23ed764b0ef88dce9720c66fbd1c0655268860cf` |
1212
| First cycle | C1: 28 September–20 December 2026; later horizons conditional through September 2028 |
1313
| Planning authority | Product Owner orders the Product Backlog; Developers forecast feasible work during Sprint Planning; names and capacity remain unassigned |
1414
| Related documents | [Framework](01_Overview_and_Scrum_Framework.md), [milestones](03_Milestones.md), [Sprint Plan](04_Sprint_Plan.md), [stories](05_Product_Backlog_and_Stories.md), [Sprint Backlogs](06_Sprint_Backlogs.md) |
1515

16-
**31 October acceptance update:** scoped current-text recovery (PYB-006.2 / M-02) and the app-only M-04 candidate pass engineering review at `bef67bd`: 984 ordinary tests, 36 frozen-runtime CI checks, both-platform recovery/keyboard evidence and all ten declared app/profile rows. The [C1-S2 record](c1-s2/00_Execution_Record.md) preserves exact artifacts, firmware baselines, earlier-row impact assessments and the temporary Android qualifier battery-policy condition. Signed packages and the release packet are prepared; original device policy and normal board advertising are restored, and owned fixtures are cleaned. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final integration; required CI and merge precede publishing. Actual M-05 store delivery remains pending. S1 remains six Done / two Prepared / four Awaiting evidence; S2 has ten engineering tasks Done and participant follow-up unfinished. Original dates/hours remain the baseline; the [continuation plan](04_Sprint_Plan.md#31-october-continuation-order-and-reforecast) records the next work and unresolved human capacity.
16+
**31 October acceptance update:** scoped current-text recovery (PYB-006.2 / M-02) and the app-only M-04 candidate pass engineering review at `bef67bd`: 984 ordinary tests, 36 frozen-runtime CI checks, both-platform recovery/keyboard evidence and all ten declared app/profile rows. The [C1-S2 record](c1-s2/00_Execution_Record.md) preserves exact artifacts, firmware baselines, earlier-row impact assessments and the temporary Android qualifier battery-policy condition. Signed packages and the release packet are prepared; original device policy and normal board advertising are restored, and owned fixtures are cleaned. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) merged after all 36 checks on its final head passed. Apple accepted the upload and started processing ([receipt](c1-s2/06_Release_Readiness.md#31-october-app-store-connect-upload-receipt)); actual M-05 store delivery remains pending. S1 remains six Done / two Prepared / four Awaiting evidence; S2 has ten engineering tasks Done and participant follow-up unfinished. Original dates/hours remain the baseline; the [continuation plan](04_Sprint_Plan.md#31-october-continuation-order-and-reforecast) records the next work and unresolved human capacity.
1717

1818
## Product Goal and decision principle
1919

‎docs/developments/2026-q4-reliable-workflow/03_Milestones.md‎

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -5,14 +5,14 @@
55

66
| Control | Value |
77
|---|---|
8-
| Status | M-01/SG0 remains Blocked on 25 September by pilot ownership/cohort/setup and capacity decisions; existing channel installations verified on retry. M-02 and scoped app-only M-04 pass 31 October engineering review; device closeout is complete. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final integration; required CI and merge precede publishing. M-05 channel delivery remains pending; forecast windows need replanning |
8+
| Status | M-01/SG0 remains Blocked on 25 September by pilot ownership/cohort/setup and capacity decisions; existing channel installations verified on retry. M-02 and scoped app-only M-04 pass 31 October engineering review; device closeout is complete. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) merged after all 36 checks on its final head passed. M-05 channel delivery remains pending; forecast windows need replanning |
99
| Planning date | 25 September 2026; dates use Asia/Bangkok |
1010
| Source | [Implementation strategy revision 1.8](../../planning/PyBLE_Implementation_Plan_and_Strategy_v1.0.md), especially §§4, 8–10, 14, and 19 |
1111
| Inspected baseline | `main` at `23ed764b0ef88dce9720c66fbd1c0655268860cf` |
1212
| Related documents | [Framework](01_Overview_and_Scrum_Framework.md), [roadmap](02_Product_Roadmap.md), [Sprint Plan](04_Sprint_Plan.md), [stories](05_Product_Backlog_and_Stories.md), [Sprint Backlogs](06_Sprint_Backlogs.md) |
1313
| Meaning | Milestones describe inspectable outcomes and decision evidence; they are not additional Scrum events or promised releases |
1414

15-
**31 October acceptance update:** scoped current-text recovery (PYB-006.2 / M-02) and the app-only M-04 candidate pass engineering review at `bef67bd`: 984 ordinary tests, 36 frozen-runtime CI checks, both-platform recovery/keyboard evidence and all ten declared app/profile rows. The [C1-S2 record](c1-s2/00_Execution_Record.md) preserves exact artifacts, firmware baselines, earlier-row impact assessments and the temporary Android qualifier battery-policy condition. Signed packages and the release packet are prepared; original device policy and normal board advertising are restored, and owned fixtures are cleaned. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final integration; required CI and merge precede publishing. Actual M-05 store delivery remains pending. S1 remains six Done / two Prepared / four Awaiting evidence; S2 has ten engineering tasks Done and participant follow-up unfinished. Original dates/hours remain the baseline; the [continuation plan](04_Sprint_Plan.md#31-october-continuation-order-and-reforecast) records the next work and unresolved human capacity.
15+
**31 October acceptance update:** scoped current-text recovery (PYB-006.2 / M-02) and the app-only M-04 candidate pass engineering review at `bef67bd`: 984 ordinary tests, 36 frozen-runtime CI checks, both-platform recovery/keyboard evidence and all ten declared app/profile rows. The [C1-S2 record](c1-s2/00_Execution_Record.md) preserves exact artifacts, firmware baselines, earlier-row impact assessments and the temporary Android qualifier battery-policy condition. Signed packages and the release packet are prepared; original device policy and normal board advertising are restored, and owned fixtures are cleaned. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) merged after all 36 checks on its final head passed. Apple accepted the upload and started processing ([receipt](c1-s2/06_Release_Readiness.md#31-october-app-store-connect-upload-receipt)); actual M-05 store delivery remains pending. S1 remains six Done / two Prepared / four Awaiting evidence; S2 has ten engineering tasks Done and participant follow-up unfinished. Original dates/hours remain the baseline; the [continuation plan](04_Sprint_Plan.md#31-october-continuation-order-and-reforecast) records the next work and unresolved human capacity.
1616

1717
## Assessment and evidence states
1818

‎docs/developments/2026-q4-reliable-workflow/04_Sprint_Plan.md‎

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -12,7 +12,7 @@
1212
| Acceptance criteria | [Product backlog and stories](05_Product_Backlog_and_Stories.md) |
1313
| Task-level proposal | [Sprint backlogs](06_Sprint_Backlogs.md) |
1414

15-
**31 October acceptance update:** scoped current-text recovery (PYB-006.2 / M-02) and the app-only M-04 candidate pass engineering review at `bef67bd`: 984 ordinary tests, 36 frozen-runtime CI checks, both-platform recovery/keyboard evidence and all ten declared app/profile rows. The [C1-S2 record](c1-s2/00_Execution_Record.md) preserves exact artifacts, firmware baselines, earlier-row impact assessments and the temporary Android qualifier battery-policy condition. Signed packages and the release packet are prepared; original device policy and normal board advertising are restored, and owned fixtures are cleaned. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) tracks final integration; required CI and merge precede publishing. Actual M-05 store delivery remains pending. S1 remains six Done / two Prepared / four Awaiting evidence; S2 has ten engineering tasks Done and participant follow-up unfinished. Original dates/hours remain the baseline; the [continuation plan](04_Sprint_Plan.md#31-october-continuation-order-and-reforecast) records the next work and unresolved human capacity.
15+
**31 October acceptance update:** scoped current-text recovery (PYB-006.2 / M-02) and the app-only M-04 candidate pass engineering review at `bef67bd`: 984 ordinary tests, 36 frozen-runtime CI checks, both-platform recovery/keyboard evidence and all ten declared app/profile rows. The [C1-S2 record](c1-s2/00_Execution_Record.md) preserves exact artifacts, firmware baselines, earlier-row impact assessments and the temporary Android qualifier battery-policy condition. Signed packages and the release packet are prepared; original device policy and normal board advertising are restored, and owned fixtures are cleaned. [PR #41](https://github.com/PyBLE-dev/PyBLE/pull/41) merged after all 36 checks on its final head passed. Apple accepted the upload and started processing ([receipt](c1-s2/06_Release_Readiness.md#31-october-app-store-connect-upload-receipt)); actual M-05 store delivery remains pending. S1 remains six Done / two Prepared / four Awaiting evidence; S2 has ten engineering tasks Done and participant follow-up unfinished. Original dates/hours remain the baseline; the [continuation plan](04_Sprint_Plan.md#31-october-continuation-order-and-reforecast) records the next work and unresolved human capacity.
1616

1717
## Forecast and commitment boundary
1818

@@ -66,7 +66,7 @@ measured velocity or a new delivery deadline. The original C1-S3 window is
6666
|---|---|---|
6767
| 1 — M-02 recovery acceptance | Accepted: DR-T01–14 reviewed against automated and exact platform evidence, including generated text and current-target consent | Completed outcome on 31 October; no measured human effort inferred from agent execution |
6868
| 2 — M-04 release qualification | Engineering pass: frozen `bef67bd` artifacts, ten declared app/profile rows, packaging and scoped review; device closeout complete; branch integration tracked separately | This outcome covers the same later forecast batches; do not repeat them without a changed artifact or invalidated evidence |
69-
| 3 — M-05 distribution | Prepared handoffs; verify account/build-number state, submit the admitted artifact after final integration, then record processing/availability and installed-channel evidence | Next release stage; owner access and external review duration remain unresolved |
69+
| 3 — M-05 distribution | Apple upload accepted and processing started; verify Google Play account/build-number state before its submission, then record actual processing/availability and installed-channel evidence | Next release stage; owner access and external review duration remain unresolved |
7070
| Parallel — M-01 pilot baseline | Confirm pilot owner, primary cohort, exact reference setup and actual weekly capacity; collect real consented baseline sessions using the prepared kit | Awaiting human inputs; engineering observations are not participant starts |
7171
| Later — M-03/M-06 learning | Collect useful-task and prospective day-7–14 follow-up observations from actual consenting activations | Preserve original recruitment targets; reforecast dates after real recruitment and capacity are known |
7272
| Conditional — Ready rehearsal | Use an assigned second operator for one exact profile only after capacity is selected | Remains optional; it is not a prerequisite for unrelated maintenance delivery |

0 commit comments