[docs] publish C1-S1 strategy, recovery design and execution evidence - #39

Merged
yyods merged 9 commits into
mainfrom
work/c1-s1-finalize
Oct 31, 2026
Merged

yyods merged 9 commits into
mainfrom
work/c1-s1-finalize

Conversation

@yyods

@yyods yyods commented Oct 31, 2026 •

Copy link
Copy Markdown
Contributor

Publish the nine previously local C1-S1 planning, design and device-evidence commits on top of the reviewed website dependency updates. The changelog preserves both sets of entries; the application, firmware and website implementation are unchanged.

The 34 Markdown files include the strategy and Scrum delivery package, bounded current-draft recovery contract/ADR, pilot and validation procedures, and dated Play/TestFlight installation evidence. C1-S1 accurately remains six Done, two Prepared and four Awaiting evidence: participant sessions and recovery implementation are not claimed complete.

Validation:

  • 42 publication tests and repository Markdown links pass.
  • All 12 Mermaid diagrams parse and render.
  • No-leak, SPDX, governance 7/7, whitespace and DCO checks pass.
  • Independent comparison confirms all prior C1-S1 documents are preserved and the website dependency tree exactly matches current main.
  • GitHub CI: all 18 jobs passed in both the PR run and push run, including website, Flutter/goldens, Android WebView, firmware host and five firmware builds. Required checks are satisfied on head 9a54bba94303a844cddde11c58fdaabeb05c589c.

The existing branch history has been preserved in a verified private Git bundle. After this PR merges, local main will be synchronized and redundant local/remote branches and auxiliary worktrees removed under the user's cleanup request. Private evidence, signing material, stash and local configuration are not included in this PR.

yyods added 9 commits October 31, 2026 09:54
Signed-off-by: Viwat Vchirawongkwin <viwat.v@chula.ac.th>
Signed-off-by: Viwat Vchirawongkwin <viwat.v@chula.ac.th>
Signed-off-by: Viwat Vchirawongkwin <viwat.v@chula.ac.th>
Signed-off-by: Viwat Vchirawongkwin <viwat.v@chula.ac.th>
Record live channel evidence and explicit device/pilot blockers, prepare the residual TestFlight metadata correction, and update strategy, Scrum views, architecture, roadmap and discovery links. Preserve four completed repository tasks and eight blocked tasks. Carry forward the reviewed recovery contract and its larger estimate without claiming runtime persistence, installations, participant results or release admission.

Signed-off-by: Viwat Vchirawongkwin <viwat.v@chula.ac.th>
Signed-off-by: Viwat Vchirawongkwin <viwat.v@chula.ac.th>
Signed-off-by: Viwat Vchirawongkwin <viwat.v@chula.ac.th>
Signed-off-by: Viwat Vchirawongkwin <viwat.v@chula.ac.th>
Signed-off-by: Viwat Vchirawongkwin <viwat.v@chula.ac.th>
@yyods
yyods merged commit 8dde8d6 into main Oct 31, 2026
36 checks passed
@yyods
yyods deleted the work/c1-s1-finalize branch October 31, 2026 03:15
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant