Skip to content

[docs] Record build 9 delivery, review submissions and production hold - #42

Merged
yyods merged 6 commits into
mainfrom
docs/recovery-channel-receipt
Oct 31, 2026
Merged

yyods merged 6 commits into
mainfrom
docs/recovery-channel-receipt

Conversation

@yyods

@yyods yyods commented Oct 31, 2026 •

Copy link
Copy Markdown
Contributor

Record the build-9 channel receipts after PR #41 merged with all 36 final-head checks passing. The frozen app's engineering qualification and artifact identities remain unchanged.

Channel Verified state on 31 October
TestFlight internal account 0.3.0 (9) installed; About and bounded physical smoke passed. The exact update transaction was not observed.
TestFlight external Build 9 assigned and submitted; Waiting for Review at 15:23:25 UTC. Automatic tester notification was unchecked.
Google Play open testing Accepted build 9 submitted; Changes in review at 15:23:55 UTC. Actual Lenovo Play installation remained 0.2.0 (8).
Google Play production Explicitly requested by the owner; the same accepted AAB is saved in a green draft for 100% of the existing 178 countries. Not submitted: the Restart review confirmation was not completed; the audience decision is pending.

Record the saved build-specific test details and reviewer notes, the verified public beta-description correction, and closure of PYB-002.1. Preserve the distinction between internal delivery, submission, approval and wider availability; M-05 and participant outcomes remain incomplete.

The production review found a concrete pre-existing mismatch between the saved ages 9–12/Families audience and Android Bluetooth discovery without Companion Device Manager. This package/audience issue also applies to the unchanged open-testing review; it is an independent source/policy finding, not a Google rejection. Scoped engineering acceptance does not establish unconditional store-policy admission. See the canonical production decision.

Validation: documentation/publication checks and retained receipt comparisons; the final PR head must pass its required CI before merge. No runtime, firmware, artifact, audience or declaration changes in this PR.

yyods added 6 commits October 31, 2026 21:08
Signed-off-by: Viwat Vchirawongkwin <viwat.v@chula.ac.th>
Signed-off-by: Viwat Vchirawongkwin <viwat.v@chula.ac.th>
Signed-off-by: Viwat Vchirawongkwin <viwat.v@chula.ac.th>
Signed-off-by: Viwat Vchirawongkwin <viwat.v@chula.ac.th>
Signed-off-by: Viwat Vchirawongkwin <viwat.v@chula.ac.th>
Signed-off-by: Viwat Vchirawongkwin <viwat.v@chula.ac.th>
@yyods yyods changed the title [docs] record accepted iOS upload and current release stage [docs] Record build 9 delivery, review submissions and production hold Oct 31, 2026
@yyods
yyods merged commit 1411abe into main Oct 31, 2026
36 checks passed
@yyods
yyods deleted the docs/recovery-channel-receipt branch October 31, 2026 16:02
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant