Project: Nested Semantic Graph (nested-semantic-graph)
Date: 2026-05-22
Close-out initiated by: Projects Agent (Sprint 4.4)
Status: COMPLETE
-
1. FINAL REPORT/SYNTHESIS — 0.7.md updated with full evaluation results from 3 pipelines (Type I/II/III), corpus statistics (27 trees, 8 languages, 1,645 triples, 0 violations), cross-linguistic findings, limitations section, and 8 references with DOIs. Publication-ready document with YAML frontmatter (DOI: 10.5281/zenodo.20348370).
-
2. PUBLICATION DOCUMENT — 0.7.md is the publication document.
- 2a. YAML frontmatter complete (title, authors, date, DOI, abstract, keywords, license)
- 2b. Math formatting verified (all LaTeX in
$...$ blocks, no bare Unicode) - 2c. Visible author block present (Author, ORCID, DOI, Date, Abstract)
- 2d. DOI registered (10.5281/zenodo.20348370)
- 2e. Copy to releases: NOT DONE (publication in project directory; user decides release timing)
-
3. ALL CORE + PHASE DOCS UPDATED
- PROJECT STATE.md: Updated with all files, last action, next step
- SPRINT.md: All S4 tasks marked [x]. Sprint complete.
- CHANGELOG.md: All entries up to 0.12.md + close-out
- LEARNINGS.md: Project-specific lessons documented
- DECISIONS.md: Architecture decisions logged
- BACKLOG.md: Remaining items triaged
-
4. GIT FINALIZED — All changes committed on feature/initial-setup branch. Clean worktree.
-
5. FINAL AUDIT — 21/21 checks pass. Core docs present, ephemeral files cleaned, no pycache, sprint tasks verified.
-
6. ARCHIVING — Project directory self-contained. New agent can start from cold.
[PASS] CLOSEOUT-CHECKLIST exists
[PASS] Final report (0.7.md) — 43 KB
[PASS] S4.1 complete (NST Visualization Tool)
[PASS] S4.2 complete (Corpus Spec)
[PASS] S4.3 complete (Publication Polish)
[PASS] S4.4 complete (Close-Out)
[PASS] All ephemeral files cleaned (9/9)
[PASS] No __pycache__
[PASS] All 7 core docs present
ALL CHECKS PASS: 21/21
| Step | Status | Owner |
|---|---|---|
| DOI registered | ✅ 10.5281/zenodo.20348370 | User |
| Published to Zenodo | ⬜ Pending | User |
| Published to ResearchGate | ⬜ Pending | User |
| Social media orchestration | ⬜ Pending | QWAV Agent |
Close-out completed 2026-05-22. Project delivered.