Skip to content
This repository was archived by the owner on Aug 6, 2026. It is now read-only.

Latest commit

 

History

History
65 lines (48 loc) · 2.47 KB

File metadata and controls

65 lines (48 loc) · 2.47 KB

PROJECT CLOSE-OUT CHECKLIST — Nested Semantic Graph

Project: Nested Semantic Graph (nested-semantic-graph) Date: 2026-05-22 Close-out initiated by: Projects Agent (Sprint 4.4) Status: COMPLETE


Mandatory Close-Out Checklist

  • 1. FINAL REPORT/SYNTHESIS — 0.7.md updated with full evaluation results from 3 pipelines (Type I/II/III), corpus statistics (27 trees, 8 languages, 1,645 triples, 0 violations), cross-linguistic findings, limitations section, and 8 references with DOIs. Publication-ready document with YAML frontmatter (DOI: 10.5281/zenodo.20348370).

  • 2. PUBLICATION DOCUMENT — 0.7.md is the publication document.

    • 2a. YAML frontmatter complete (title, authors, date, DOI, abstract, keywords, license)
    • 2b. Math formatting verified (all LaTeX in $...$ blocks, no bare Unicode)
    • 2c. Visible author block present (Author, ORCID, DOI, Date, Abstract)
    • 2d. DOI registered (10.5281/zenodo.20348370)
    • 2e. Copy to releases: NOT DONE (publication in project directory; user decides release timing)
  • 3. ALL CORE + PHASE DOCS UPDATED

    • PROJECT STATE.md: Updated with all files, last action, next step
    • SPRINT.md: All S4 tasks marked [x]. Sprint complete.
    • CHANGELOG.md: All entries up to 0.12.md + close-out
    • LEARNINGS.md: Project-specific lessons documented
    • DECISIONS.md: Architecture decisions logged
    • BACKLOG.md: Remaining items triaged
  • 4. GIT FINALIZED — All changes committed on feature/initial-setup branch. Clean worktree.

  • 5. FINAL AUDIT — 21/21 checks pass. Core docs present, ephemeral files cleaned, no pycache, sprint tasks verified.

  • 6. ARCHIVING — Project directory self-contained. New agent can start from cold.


Audit Results (2026-05-22)

[PASS] CLOSEOUT-CHECKLIST exists
[PASS] Final report (0.7.md) — 43 KB
[PASS] S4.1 complete (NST Visualization Tool)
[PASS] S4.2 complete (Corpus Spec)
[PASS] S4.3 complete (Publication Polish)
[PASS] S4.4 complete (Close-Out)
[PASS] All ephemeral files cleaned (9/9)
[PASS] No __pycache__
[PASS] All 7 core docs present
ALL CHECKS PASS: 21/21

Publication Workflow Status

Step Status Owner
DOI registered ✅ 10.5281/zenodo.20348370 User
Published to Zenodo ⬜ Pending User
Published to ResearchGate ⬜ Pending User
Social media orchestration ⬜ Pending QWAV Agent

Close-out completed 2026-05-22. Project delivered.