Signed-off-by: Jeff Ng <jeffng@precisioninno.com>
There was a problem hiding this comment.
Code Review
This pull request updates regression rule baselines across several designs, including cva6, ethmac, gcd, hercules_idecode, hercules_is_int, ibex, and jpeg, primarily adjusting timing and area metrics. Feedback was provided regarding the hercules_is_int design, where inconsistencies were found between flow stages; specifically, hold slack baselines for global route and finish stages were not updated to reflect degradations in preceding stages, which may cause CI failures.
| }, | ||
| "globalroute__timing__hold__ws": { | ||
| "value": -0.0343, | ||
| "value": -0.0567, |
There was a problem hiding this comment.
The finish__timing__hold__ws metric (line 75) was not updated to reflect the degradation in globalroute__timing__hold__ws (-0.0567). Since finish hold slack is typically worse than or equal to global route slack, leaving the finish baseline at -0.0404 (which is now tighter than the global route baseline) will likely cause regression failures in the CI.
References
- When updating regression rules, ensure the committed data accurately reflects the intended results of the change. Discrepancies between flow stages or metrics should be investigated and explained.
| }, | ||
| "cts__timing__hold__ws": { | ||
| "value": -0.0125, | ||
| "value": -0.0699, |
There was a problem hiding this comment.
The globalroute__timing__hold__ws (line 59) and finish__timing__hold__ws (line 75) metrics were not updated to reflect the significant degradation in cts__timing__hold__ws (-0.0699). This inconsistency between flow stages will likely lead to CI failures, as subsequent stages are expected to have similar or worse hold slack than the CTS stage.
References
- When updating regression rules, ensure the committed data accurately reflects the intended results of the change. Discrepancies between flow stages or metrics should be investigated and explained.
|
goes with https://github.com/The-OpenROAD-Project-private/rapidus/pull/103, so that PR will need to be approved and merged when this PR goes in. |
cva6 base
cva6 verific
ethmac base
ethmac verific
gcd base
gcd verific
hercules_idecode base
hercules_idecode verific
hercules_is_int base
hercules_is_int verific
ibex base
ibex verific
jpeg base
jpeg verific