Skip to content

Latest commit

 

History

History
53 lines (46 loc) · 5.38 KB

P7_COMMISSIONING_PREP_MANIFEST.md

File metadata and controls

53 lines (46 loc) · 5.38 KB

Phase P7 Commissioning Preparation Manifest / Manifiesto de Preparación P7

Document ID: P7_COMMISSIONING_PREP_MANIFEST
Date / Timestamp: 2026-09-17T15:20:00-07:00
Milestone: Milestone CORE-08 / Plan v3 Offline Accepted / Phase P7 Hand-off
State Contract: STATE: CORE-08 CONFIG_AND_TEST_OK RUNTIME_PENDING_P7
Supervisor Offline Accepted: true (Signoff Timestamp: 2026-09-17T14:20:00-07:00)
Operational Mode: offline/DEV [PRODUCT_EVIDENCE] $\to$ P7_MANUAL
Live Telemetry Reality: verified_live: false (Zero VERIFIED_LIVE claimed)
Hardware Policy: NO_PLC_DOWNLOAD_FAIL_CLOSED (Locks COM1..COM256, companion flash utilities, Win32 32827/33149)
Commissioning Directive: DEFERRED_MANUAL_COMMISSIONING_ENGINEER_LOAD (Manual load by Armando Silva via Cscape GUI Ctrl+F9)
Active Project Container: TankLevel_P5_Dedicated.csp (Clean build: 0 errors, 0 warnings)
Container SHA-256: 9f69f6a2ee12dab54087ab27bb839f40e01d6d65544a546139788519acd80ab1 (Reference build: 2da72f913d80a13346452ba5c3dbb9f2bf61a0c4f8d22d64a2f8bdf969e6b66b)
Serial Driver: MJ1 CT RTU Modbus CMP v5.05 (CTRtu.dll v5.5.0.0, Modbus Master RTU, RS-485 Half-Duplex, 19200-8-N-1)
Scan List Status: EMPTY_UNTIL_LIVE (count: 0; native add blocked offline pending live RS-485 bus connection)
Compiler / Hygiene Invariant: no_error_check_loop: true (Single-pass verification complete; zero periodic polling loops)
Single GUI Automation Owner: Cscape 10.2 PID 12788 on winsta0\Default (HWND 3016360)
Pointers to Governance & Artifacts:

  • Supervisor Signoff: SUPERVISOR_OFFLINE_ACCEPTANCE.md
  • Evidence Package: offline_evidence_bundle_v1.0.0.zip (335,933 bytes, SHA-256: 16a1ac91445a9067c24617b61063ddf9585ef272af6fa1c707fd83f1d8fec512)
  • Commissioning SOP: P7_MANUAL_COMMISSIONING_PROCEDURE.md
  • Pre-Load Checklist: P7_MANUAL_LOAD_CHECKLIST.md

1. Autonomous Agent Consortium Verification Sign-Off (~10 Specialized Agents)

  1. Lead Orchestrator: Evidence-gated progression G0 $\to$ G5 enforced; verified 4-state contract (status: success) and critical path management.
  2. Research Agent: PE binary forensics on CTRtu.dll (v5.5.0.0) and Modbus.dll (v5.7.0.0) completed; Straton K5 quarantined; ST$\to$LD documented BLOCKED_NATIVE.
  3. Single GUI Automation Agent: Exclusive ownership of winsta0\Default maintained; Cscape PID 12788 / HWND 3016360 active and visible with TankLevel_P5_Dedicated.csp.
  4. PLC / IEC 61131-3 Agent: Pure ST AST validated across all POUs (FB_ModbusScaleQuality.st, TankLevelModbusBridge.st, TankLevelControl.st); ladder constructs rejected (ERR_LADDER_FORBIDDEN).
  5. Simulation & Verification Agent: Pure-software cyclic scan verified (SimulationBackend.EMULATED); Modbus register scaling ($0..32000 \to 0.0..100.0%$, $0..500\text{ L/min}$, $0..10\text{ bar}$) and fail-safe clamping verified.
  6. MCP Architecture Agent: FastMCP JSON-RPC 2.0 stdio server operational with 43 validated public tools (including tools #41, #42, #43 for scan-list validation, inspection, and reconciliation).
  7. Security & Safety Guard Agent: Fail-closed hardware lockout certified (COM1..COM256, CAN, USB, companion binaries, Win32 download command IDs 32827/33149 locked fail-closed).
  8. Documentation & Standards Specialist: Dual-root synchronization between primary workspace (C:\HornerAI\horner-cscape-mcp\) and user home (C:\Users\ArmandoSilva\) actively maintained.
  9. Process Variable & Modbus Protocol Agent: Deep protocol inventory (modbus_protocol_inventory.json) and PV sidecars (modbus_pv_config.json) validated for slave units 1..3 (DEV_LT01, DEV_FT01, DEV_PT01).
  10. Field Commissioning & P7 Prep Specialist: Standard Operating Procedure (SOP-P7-HORNER-COMMISSIONING-001), refreshed safety checklist (P7_MANUAL_LOAD_CHECKLIST.md), and air-gapped evidence packaging certified.

2. Invariants & Safety Verification Summary

Invariant Category Configured Setting Active Verification Evidence Status
Error Check Compilation Single-pass dispatched (32826) Output window: 0 errors, 0 warnings success
Hygiene Polling Loop no_error_check_loop: true Zero periodic polling loops active success
Serial Port MJ1 Driver MJ1 CT RTU Modbus CMP v5.05 Verified in CFBF container & GUI tree success
MJ1 Scan List Table EMPTY_UNTIL_LIVE (count: 0) Documented empty offline; add blocked offline success
Phase P7 Commissioning DEFERRED_MANUAL_ENGINEER_LOAD Physical download deferred to Armando Silva DEFERRED
Live Telemetry Reality verified_live: false Zero live hardware claims permitted success
Hardware Port Lockout Ports COM1..COM256 locked SecurityError raised fail-closed blocked
Win32 Download Lockout IDs 32827 and 33149 blocked Win32 message dispatch intercepted blocked
New Offline Phases new_offline_phases: false Offline phases closed and accepted success