Skip to content

Phases LCD defaults should be configurable or same as 1.2 #196

Description

@peppersass

Several issues related to the new behavior of the Phasing LCDs in 1.3.0:

  1. Phases LCDs have been changed so that "time-to-DRY" and "time-to-FC" are the defaults. Although the display can be changed to the pre-1.3.0 defaults of "projected-DRY-time" and "projected-FC-time" by right-clicking the values, the default cannot be changed. Consequently, those of us who prefer the pre-1.3.0 behavior must change the Phases LCDs every roast. Please make the behavior configurable or return to the pre-1.3.0 default.

  2. Prior to 1.3.0, the FC Pahses LCD switches from "projected-FC-time" to %DEV when the First Crack Start event is clicked. Now it only switches when if the operator clicks on the value in the box, which is an extra step (found this by accident.) Please make the behavior configurable or return to the pre-1.3.0 default.

  3. The fly-out help for the Phases LCDs doen't match the behavior. It says to right-click to cycle between TIME, TEMP and PERCENT. It looks like the DRY% LCD switches between % and TEMP, but the label doesn't change (stays at DRY%). The other two LCDs cycle between "time until" and "time when". The fly-out help should be changed and the DRY% header should change as apropropriate.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Projects

    No projects

      Milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions