Skip to content

Latest commit

 

History

History
24 lines (17 loc) · 1.24 KB

flow_configuration.md

File metadata and controls

24 lines (17 loc) · 1.24 KB

Flow configuration

  • Quick start
    Here you will find the things you need to do after deployment.
    These steps will ensure you have initiated the flow propperly.

  • Setup Guidelines
    If you want to have a good start with the flow, and be comfortable soon, here are the guidelines which help you get there fast.
    If you don't know about these rules or logic, you can end up with an unstable flow. Meaning it is correcting too much or the wrong way. It can even lead to discomfort and/or higher costs than needed.
    So it is advised to at least read it once.

  • Functions
    The flow I built contains extra functions. Functions which are often not even present in the Panasonic solution.
    This section will list the functions, explain the purpose / benefit and how to use it.

  • External sensors
    The flow’s custom functions can operate with custom sensors.
    This section will describe the process of adding external custom sensors.

  • Tips
    Here will be a gathering of tips and tricks.


Back