Skip to content

Commit 376f81c

Browse files
committed
docs(handover): v1.10.0 released — the wind-down sequence is done
Records what the release actually verified (artifacts downloaded + checksummed + run, consumers redeployed and live, cw-arcade re-tested) so the next session does not re-derive it, and the two release-workflow hazards: the by-hand-release-before-the-workflow one that broke zwasm v2.4.1, and the TOCTOU in `gh release view || gh release create` across the matrix legs, which v1.10.0 missed by 47 seconds.
1 parent b6d4a3e commit 376f81c

1 file changed

Lines changed: 16 additions & 12 deletions

File tree

‎.dev/handover.md‎

Lines changed: 16 additions & 12 deletions
Original file line numberDiff line numberDiff line change
@@ -18,18 +18,22 @@
1818
lookbehind / `\A\z\Z` / class algebra, multidim aget/aset, and the GC
1919
stops taxing long-running programs 2-4x — D-571/573/446/447 discharged).
2020
CHANGELOG is the release-history SSOT.
21-
- **First task on resume**: the wind-down sequence, NOT a feature unit. In
22-
order: zwasm 2.5.0 (user-tagged) → bump the `.zwasm` pin + full gate →
23-
cut the final cljw release tag → point cw-arcade / cw-playground /
24-
cw-serverless-demo at that tag instead of a PATH `cljw` → post the
25-
Discussions announcement (Announcements, pinned; the README already
26-
carries the notice). The PERF CAMPAIGN (D-450, rush-hour 12.3 s, next
27-
step was a re-profile) is **stopped, not paused** — its findings stay in
28-
the row as a record. Release-process note that still applies: cutting a
29-
GitHub release BY HAND before the tag workflow runs breaks the artifact
30-
upload (zwasm #160 — use `view || create` then `upload --clobber`).
31-
- **Unreleased on main**: the Discussion #12/#13/#14 fixes + the two new
32-
gates. CHANGELOG `[Unreleased]` is the SSOT for what they were.
21+
- **First task on resume**: the wind-down is DONE except the announcement —
22+
post it in Discussions (Announcements, pinned) when the user decides to.
23+
**v1.10.0 is released and is the final release** (2026-08-12): zwasm pin
24+
v2.5.0, full gate 435/435, 3-OS CI green, artifacts verified by download +
25+
checksum + running the macOS binary, homebrew tap bumped, cw-playground
26+
and cw-serverless-demo redeployed on it (both live), cw-arcade re-verified
27+
(32 tests / 153 assertions green; it pins nothing by design). The PERF
28+
CAMPAIGN (D-450) is **stopped, not paused** — findings stay in the row as
29+
a record.
30+
- **Unreleased on main**: nothing. CHANGELOG `[1.10.0]` is the SSOT.
31+
- **Release-process hazards** (both live in `.github/workflows/release.yml`):
32+
cutting the GitHub release BY HAND before the tag workflow runs breaks the
33+
artifact upload (zwasm #160), and the workflow's `gh release view || gh
34+
release create` is TOCTOU across the two matrix legs — if they reach it
35+
within the same instant, the loser fails on "already exists" under
36+
`set -e`. v1.10.0 missed it by 47 s. Never hit, never fixed.
3337
- **Forbidden**: bare `zig build test` without `-Dwasm`; bare `zig build` for a
3438
probe (use ReleaseSafe). The FULL gate runs `--serial-e2e`, ALONE; never a
3539
concurrent build during a gate. `.claude/**` edits + cross-repo publishes may

0 commit comments

Comments
 (0)