| F | Runner | Merged: F1 (lifecycle store, coordinator, shutdown wiring, startup recovery and the lock, planning API, feedback events, and stops that wait for their commit: #53, #74, #57, #59, #60, #96); F2a–F2b (execute prompts, audit, per-item execution, real workspace, durable safety findings: #67, #68, #92, #94, #128); F2d (already-fixed check, PR opening, branch pusher, production publishing, closing PRs on cancel: #84, #101, #110, #115, #116, #119, #123); production wiring and `start`/`resume` (#91, PRs #102, #105); planning through lane D (#117, #124, PRs #118, #120, #125); merging the task's own PR (#121, PR #126); start/resume approval, review-version, recovery and completed-prefix guards (#107, PR #130); continuation after a scope pause (#88, PR #134); the F3 durable trusted local-rebase foundation (#22, PR #136); the F4 foreign-conflict engine plus production sandbox adapter (#22, PRs #138 and #140); and sandboxed owned-commit conflict resolution (#22, PR #144). Next in #22: F5 owns current base/head refresh, rebase admission, post-rebase attribution and approval refresh, and head-bound `cmd:` execution. F6 owns rewritten-head push, fresh required-check refresh, the already-fixed rerun, and exact-pair guarded-merge handoff. The integrated flow pushes a rewritten head before it recomputes review state and reruns every plan item's head-bound `cmd:` checks; fresh required GitHub checks follow. |
0 commit comments