Skip to content

Commit bedc662

Browse files
ehsun-shclaude
andcommitted
Correct the status banner: phase 2 is complete, not partial
The banner still said single-polarization coherent was 'working' while dual polarization, pulse shaping and differential encoding had all landed. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
1 parent 897e22e commit bedc662

1 file changed

Lines changed: 4 additions & 3 deletions

File tree

README.md

Lines changed: 4 additions & 3 deletions
Original file line numberDiff line numberDiff line change
@@ -9,12 +9,13 @@
99

1010
---
1111

12-
> ### ⚠️ Project status: pre-alpha — Phases 0, 1 and 1.5 complete; single-polarization coherent working
12+
> ### ⚠️ Project status: pre-alpha — Phases 0, 1, 1.5 and 2 complete. No GUI yet.
1313
>
1414
> Two complete links run end to end and produce numbers that match theory.
1515
> **Direct detection:** PRBS → NRZ → CW laser → MZM → fiber (loss + dispersion) → PIN → filter →
16-
> eye/Q/BER. **Coherent:** PRBS → Gray-coded M-QAM → IQ driver → IQ modulator → 90° hybrid with
17-
> balanced detection → EVM/SNR and counted symbol errors, up to 256-QAM.
16+
> eye/Q/BER. **Coherent:** PRBS → Gray-coded M-QAM → RRC shaping → IQ modulator → 90° hybrid with
17+
> balanced detection → carrier recovery → EVM/SNR and counted errors, up to 256-QAM, and dual
18+
> polarization at 256 Gb/s with a blind butterfly equaliser.
1819
> Every physics block is validated against a closed-form result in CI.
1920
>
2021
> Projects save to versioned JSON and sweeps are first-class, so a curve is one call rather than

0 commit comments

Comments
 (0)