Skip to content

Commit 9ce0c04

Browse files
feat: add mpc controller (#104)
* add mpc controller * Apply suggestions from code review Co-authored-by: github-actions[bot] <41898282+github-actions[bot]@users.noreply.github.com> * fix build * fix comments --------- Co-authored-by: github-actions[bot] <41898282+github-actions[bot]@users.noreply.github.com>
1 parent 32bc698 commit 9ce0c04

25 files changed

Lines changed: 2015 additions & 0 deletions

‎.vscode/launch.json‎

Lines changed: 20 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -101,6 +101,26 @@
101101
}
102102
]
103103
},
104+
{
105+
"name": "MPC Controller Simulator",
106+
"type": "cppdbg",
107+
"request": "launch",
108+
"program": "${workspaceFolder}/build/host/simulator/controllers/Mpc/Debug/numerical.simulator.controllers.mpc",
109+
"args": [],
110+
"stopAtEntry": false,
111+
"cwd": "${workspaceFolder}",
112+
"environment": [],
113+
"externalConsole": false,
114+
"MIMode": "gdb",
115+
"miDebuggerPath": "/usr/bin/gdb",
116+
"setupCommands": [
117+
{
118+
"description": "Enable pretty-printing for gdb",
119+
"text": "-enable-pretty-printing",
120+
"ignoreFailures": true
121+
}
122+
]
123+
},
104124
{
105125
"name": "Linux Debug",
106126
"type": "cppdbg",

‎doc/controllers/Mpc.md‎

Lines changed: 165 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,165 @@
1+
# Model Predictive Controller (MPC)
2+
3+
## Overview & Motivation
4+
5+
Model Predictive Control (MPC) is a receding-horizon optimal control strategy that computes control inputs by solving a finite-horizon optimization problem at each time step. Unlike LQR, which applies a fixed gain computed offline, MPC re-solves the optimization online, enabling it to handle constraints on control inputs directly.
6+
7+
At each sample instant, MPC predicts the future system trajectory over a prediction horizon $N_p$, optimizes a sequence of control moves over a control horizon $N_c \leq N_p$, applies only the first control move, and repeats at the next step. This receding-horizon approach provides feedback and robustness to disturbances.
8+
9+
**Key advantages over LQR:**
10+
- Explicit handling of input constraints (actuator limits)
11+
- Preview and anticipation of future reference changes
12+
- Tunable trade-off between horizon length and computational cost
13+
14+
**When to use MPC:**
15+
- Systems with actuator saturation or operational limits
16+
- Multi-input multi-output (MIMO) systems requiring coordinated control
17+
- Applications where the computational budget allows online optimization (typically $N_c \cdot m \leq 20$)
18+
19+
## Mathematical Theory
20+
21+
### Prerequisites
22+
23+
- Discrete-time linear state-space model: $x_{k+1} = Ax_k + Bu_k$
24+
- Quadratic cost weighting matrices $Q \succeq 0$ (state), $R \succ 0$ (control)
25+
- Optional terminal cost matrix $P \succeq 0$ (typically from DARE)
26+
27+
### Core Definitions
28+
29+
**Cost function** over prediction horizon $N_p$ with control horizon $N_c$:
30+
31+
$$J = \sum_{k=0}^{N_p-1} x_k^T Q\, x_k + \sum_{k=0}^{N_c-1} u_k^T R\, u_k + x_{N_p}^T P\, x_{N_p}$$
32+
33+
For $k \geq N_c$, the control input is held at $u_{N_c-1}$ or zero (our implementation sets it to zero beyond $N_c$).
34+
35+
### Prediction Matrices
36+
37+
The future state trajectory can be expressed as:
38+
39+
$$\mathbf{X} = \Psi\, x_0 + \Theta\, \mathbf{U}$$
40+
41+
where $\mathbf{X} = [x_1^T, x_2^T, \ldots, x_{N_p}^T]^T$ and $\mathbf{U} = [u_0^T, u_1^T, \ldots, u_{N_c-1}^T]^T$.
42+
43+
**State propagation matrix** $\Psi$ ($N_p n \times n$):
44+
45+
$$\Psi = \begin{bmatrix} A \\ A^2 \\ \vdots \\ A^{N_p} \end{bmatrix}$$
46+
47+
**Control-to-state matrix** $\Theta$ ($N_p n \times N_c m$):
48+
49+
$$\Theta = \begin{bmatrix} B & 0 & \cdots & 0 \\ AB & B & \cdots & 0 \\ A^2B & AB & \cdots & 0 \\ \vdots & \vdots & \ddots & \vdots \\ A^{N_p-1}B & A^{N_p-2}B & \cdots & A^{N_p-N_c}B \end{bmatrix}$$
50+
51+
### QP Formulation
52+
53+
Substituting predictions into the cost yields a quadratic program in $\mathbf{U}$:
54+
55+
$$J = \mathbf{U}^T H\, \mathbf{U} + 2\, x_0^T F^T \mathbf{U} + \text{const}$$
56+
57+
where:
58+
59+
$$H = \Theta^T \bar{Q}\, \Theta + \bar{R}$$
60+
$$F = \Theta^T \bar{Q}\, \Psi$$
61+
62+
$\bar{Q}$ is block-diagonal with $Q$ on the first $N_p - 1$ blocks and $P$ on the last block. $\bar{R}$ is block-diagonal with $R$ repeated $N_c$ times.
63+
64+
### Unconstrained Solution
65+
66+
Setting $\nabla_{\mathbf{U}} J = 0$:
67+
68+
$$\mathbf{U}^* = -H^{-1} F\, x_0$$
69+
70+
Solved via Gaussian elimination ($H\, \mathbf{U}^* = -F\, x_0$) rather than explicit matrix inversion.
71+
72+
### Box Constraints
73+
74+
For control input constraints $u_{\min} \leq u_k \leq u_{\max}$, a simple projected approach clamps each element of the unconstrained solution. This is a first-order approximation; for tight constraints or state constraints, a full QP solver would be required.
75+
76+
## Complexity Analysis
77+
78+
| Phase | Time | Space | Notes |
79+
|----------|----------------------|------------------------------------|----------------------------------------------------|
80+
| Offline | $O(N_p^2 \cdot n^3)$ | $O((N_c m)^2 + N_p n \cdot N_c m)$ | Prediction matrices, Hessian, gradient precomputed |
81+
| Online | $O((N_c m)^3)$ | $O((N_c m)^2)$ | Gaussian elimination to solve $H\mathbf{U}=-Fx$ |
82+
| Per step | $O(N_c m \cdot n)$ | $O(N_c m)$ | Matrix-vector product $Fx$ + constraint clamping |
83+
84+
For typical embedded use ($n=2, m=1, N_c=10$): the online solve is a $10 \times 10$ linear system, well within real-time budgets.
85+
86+
## Step-by-Step Walkthrough
87+
88+
**System:** Double integrator with $dt = 0.1$ s
89+
90+
$$A = \begin{bmatrix} 1 & 0.1 \\ 0 & 1 \end{bmatrix}, \quad B = \begin{bmatrix} 0.005 \\ 0.1 \end{bmatrix}$$
91+
92+
$$Q = \begin{bmatrix} 10 & 0 \\ 0 & 1 \end{bmatrix}, \quad R = [0.1], \quad N_p = N_c = 3$$
93+
94+
**Step 1 — Build $\Psi$:**
95+
96+
$$\Psi = \begin{bmatrix} A \\ A^2 \\ A^3 \end{bmatrix} = \begin{bmatrix} 1 & 0.1 \\ 0 & 1 \\ 1 & 0.2 \\ 0 & 1 \\ 1 & 0.3 \\ 0 & 1 \end{bmatrix}$$
97+
98+
**Step 2 — Build $\Theta$:**
99+
100+
$$\Theta = \begin{bmatrix} 0.005 & 0 & 0 \\ 0.1 & 0 & 0 \\ 0.015 & 0.005 & 0 \\ 0.2 & 0.1 & 0 \\ 0.03 & 0.015 & 0.005 \\ 0.3 & 0.2 & 0.1 \end{bmatrix}$$
101+
102+
**Step 3 — Compute $H$ and $F$:**
103+
104+
$H = \Theta^T \bar{Q} \Theta + \bar{R}$ produces a $3 \times 3$ positive definite matrix.
105+
106+
$F = \Theta^T \bar{Q} \Psi$ produces a $3 \times 2$ matrix.
107+
108+
**Step 4 — Online solve for $x_0 = [1, 0]^T$:**
109+
110+
Solve $H\, \mathbf{U}^* = -F \cdot [1, 0]^T$ via Gaussian elimination.
111+
112+
Apply first element $u_0^*$ to the plant.
113+
114+
## Pitfalls & Edge Cases
115+
116+
- **Horizon too short:** If $N_p$ is too small, the controller is myopic and may produce oscillatory or unstable behavior. Use DARE terminal cost $P$ to mitigate.
117+
- **Ill-conditioned Hessian:** Very large $Q/R$ ratios create poorly conditioned $H$. Keep $Q$ and $R$ within 3–4 orders of magnitude of each other.
118+
- **Constraint infeasibility:** Box constraints that are too tight for the required control effort will clamp every step, degrading performance. Monitor constraint activity.
119+
- **Fixed-point overflow:** For Q15/Q31 types, the Hessian elements grow with horizon length. Keep $N_c \cdot m$ small and scale weights carefully.
120+
- **Stack usage:** All matrices are stack-allocated. A system with $n=3, m=2, N_c=10$ creates a $20 \times 20$ Hessian (1600 bytes for float). Monitor stack budget.
121+
- **Terminal cost omission:** Without terminal cost $P$, the controller ignores cost-to-go beyond the horizon, leading to suboptimal or unstable behavior for short horizons.
122+
123+
## Variants & Generalizations
124+
125+
| Variant | Key Difference | Use Case |
126+
|----------------------|-------------------------------------------------------------|-----------------------------------|
127+
| Nonlinear MPC (NMPC) | Nonlinear prediction model, requires iterative optimization | Nonlinear plants, high-accuracy |
128+
| Explicit MPC | Precomputes control law as piecewise affine function | Very fast online evaluation |
129+
| Move-Blocking MPC | Constrains control moves to change only at specific steps | Reduces QP size |
130+
| Adaptive MPC | Updates plant model online | Time-varying or uncertain systems |
131+
| Distributed MPC | Decomposes problem across subsystems | Large-scale multi-agent systems |
132+
| Robust MPC | Accounts for bounded disturbances in constraints | Safety-critical applications |
133+
134+
## Applications
135+
136+
- **Autonomous vehicles:** Path tracking with steering and acceleration limits
137+
- **Process control:** Chemical reactor temperature/pressure regulation with valve constraints
138+
- **Robotics:** Joint torque-constrained trajectory tracking
139+
- **Power electronics:** Voltage/current regulation in converters with switching constraints
140+
- **HVAC systems:** Energy-efficient building climate control with comfort bounds
141+
- **Quadrotor control:** Attitude and position control with thrust limits
142+
143+
## Connections to Other Algorithms
144+
145+
```mermaid
146+
graph LR
147+
DARE["Discrete Algebraic<br/>Riccati Equation"] -->|terminal cost P| MPC["Model Predictive<br/>Controller"]
148+
GE["Gaussian<br/>Elimination"] -->|solves H·U = -F·x| MPC
149+
LQR["LQR Controller"] -.->|special case<br/>N→∞, no constraints| MPC
150+
MPC -->|first control move| Plant["Plant Model"]
151+
Plant -->|state measurement| MPC
152+
```
153+
154+
- **LQR** is the infinite-horizon, unconstrained special case of MPC. As $N_p \to \infty$ with DARE terminal cost, the MPC gain converges to the LQR gain.
155+
- **DARE** computes the terminal cost matrix $P$, ensuring the finite-horizon problem approximates the infinite-horizon solution.
156+
- **Gaussian Elimination** solves the dense linear system $H\mathbf{U} = -Fx$ at each step. For constrained problems, iterative QP solvers could replace this.
157+
- **Kalman Filter** provides state estimates when full state measurement is unavailable (MPC + KF = output-feedback MPC).
158+
159+
## References & Further Reading
160+
161+
- Maciejowski, J.M., *Predictive Control with Constraints*, Prentice Hall, 2002.
162+
- Rawlings, J.B. and Mayne, D.Q., *Model Predictive Control: Theory and Design*, Nob Hill Publishing, 2009.
163+
- Camacho, E.F. and Bordons, C., *Model Predictive Control*, 2nd ed., Springer, 2007.
164+
- Borrelli, F., Bemporad, A., and Morari, M., *Predictive Control for Linear and Hybrid Systems*, Cambridge University Press, 2017.
165+
- Wang, L., *Model Predictive Control System Design and Implementation Using MATLAB*, Springer, 2009.

‎doc/controllers/README.md‎

Lines changed: 1 addition & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -8,3 +8,4 @@ Feedback control algorithms for regulating dynamic systems in real time.
88
|--------------------------|-----------------------------------------------------------------------------------------|
99
| [PID Controller](Pid.md) | Proportional-Integral-Derivative controller using a discrete recursive formulation |
1010
| [LQR Controller](Lqr.md) | Linear Quadratic Regulator — optimal state-feedback control minimizing a quadratic cost |
11+
| [MPC Controller](Mpc.md) | Model Predictive Controller — receding-horizon optimal control with constraint handling |

‎numerical/controllers/implementations/CMakeLists.txt‎

Lines changed: 2 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -13,6 +13,8 @@ target_link_libraries(numerical.controllers.implementations PUBLIC
1313
target_sources(numerical.controllers.implementations PRIVATE
1414
Lqr.cpp
1515
Lqr.hpp
16+
Mpc.cpp
17+
Mpc.hpp
1618
PidIncremental.cpp
1719
PidIncremental.hpp
1820
)
Lines changed: 9 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,9 @@
1+
#include "numerical/controllers/implementations/Mpc.hpp"
2+
3+
namespace controllers
4+
{
5+
template class Mpc<float, 2, 1, 5, 5>;
6+
template class Mpc<float, 2, 1, 10, 10>;
7+
template class Mpc<float, 3, 1, 10, 10>;
8+
template class Mpc<float, 2, 1, 10, 5>;
9+
}

0 commit comments

Comments
 (0)