[CI probe, do not merge] Run the Kit visualizer pause checks on CI hardware (NVBUG 6570125) #10093
Triggered via pull request
August 13, 2026 18:17
Status
Cancelled
Total duration
2h 11m 30s
Artifacts
2
install-ci.yml
on: pull_request
Detect Changes
4s
Installation Tests (x86)
43m 1s
Installation Tests (ARM)
2h 11m
Annotations
2 errors and 1 warning
|
Installation Tests
Canceling since a higher priority waiting request for Installation Tests-7055 exists
|
|
Installation Tests (ARM)
Canceling since a higher priority waiting request for Installation Tests-7055 exists
|
|
Installation Tests (x86)
Node.js 20 is deprecated. The following actions target Node.js 20 but are being forced to run on Node.js 24: astral-sh/setup-uv@v6. For more information see: https://github.blog/changelog/2025-09-19-deprecation-of-node-20-on-github-actions-runners/
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
install-ci-junit-X64
Expired
|
1.81 KB |
sha256:fa0a7e2fdb94793f8bce7b8e914d8c92b5e945d19929bfb36b32c0a7e290bf2a
|
|
|
pytest-results-install-tests-x86-X64--v1-567038244-31729989800-1-94547774479
Expired
|
2.32 KB |
sha256:a55b02237005fbe66996097e091350509ce0c7dc7038c52378e727fa507e062f
|
|