Skip to content

Commit e624d1c

Browse files
committed
[fix.fep.λ.D8+] make the benchmark network visually representative
Replace the three-node review fixture with a connected eight-ligand T4L planning network because the repository hero must demonstrate the actual network-review instrument rather than a separate pose-review surface. Keep the cached snapshot fail-closed and label its local identity explicitly so it cannot be mistaken for a durable OpenFE result. Browser acceptance at 1600x1000 confirmed 8 nodes, 13 edges, zero overlap, full graph containment, plan-only status and execution disabled.
1 parent e0c0724 commit e624d1c

7 files changed

Lines changed: 3493 additions & 3171 deletions

File tree

‎README.md‎

Lines changed: 3 additions & 3 deletions
Original file line numberDiff line numberDiff line change
@@ -53,9 +53,9 @@ being developed.
5353

5454
![Motif Workbench FEP network review and governed execution workspace](docs/screenshots/06_motif_fep_workspace.png)
5555

56-
*A free-energy campaign workspace: ligand-network review, atom-mapping evidence, exact
57-
prepared-system selection and durable execution controls remain visible in one frame. A
58-
network plan is labelled as a plan, never as an FEP result.*
56+
*An eight-ligand T4 lysozyme FEP planning workspace: the complete transformation network,
57+
atom-mapping evidence, exact prepared-system selection and durable execution controls remain
58+
visible in one frame. The cached benchmark is labelled as a plan, never as an FEP result.*
5959

6060
| Stage | What the frontend makes inspectable |
6161
|---|---|

‎docs/architecture/dirac-digital-twin.html‎

Lines changed: 1 addition & 1 deletion
Large diffs are not rendered by default.

0 commit comments

Comments
 (0)