  • Weeks 7-10. Goals G2.1-G2.4. Exit: G2.1 measured (warm swap <= 1.5s), G2.3 ablation published.

    No due date
    4/4 issues closed
  • Single-pipeline proof: parity, timing, router, memory

    Overdue by 5 day(s)
    Due by August 31, 2026
    3/5 issues closed
  • Foundation: load/generate/unload measured, capsule round-trips, harness + baseline

    Overdue by 17 day(s)
    Due by August 19, 2026
    5/5 issues closed