Unified Grid-Tied and Grid-Forming BESS Control

This example is a transparent, executable engineering translation of the controller framework in Khan et al., “Design of a Unified Controller Framework for Grid-tied and Grid-forming Battery Energy Storage System,” DOI 10.1109/IECON49645.2022.9968382. It is not a numerically exact reproduction: the paper does not publish all controller equations, gains, plant parameters, solver settings, transition rules, or initial conditions needed to recreate its results.

Caution

This is an educational research reference. It is not a qualified plant controller, protection system, grid-code certification model, or substitute for converter, battery, network, hardware-in-the-loop, and site validation.

Original unified BESS controller architecture

Engineering question

Can one deterministic reference exercise grid-following P/Q control, grid-forming voltage/frequency control, grid loss, islanded load support, synchronization, reconnection, saturation, measurement faults, and recovery with every important behavior covered by executable assertions?

The answer for the documented reduced-order plant and starter parameters is yes. The model:

  • uses a 10 MVA, 690 V line-to-line, 50 Hz per-unit base;
  • represents a balanced dq-current/filter-equivalent converter/PCC plant;
  • executes at a fixed 5 ms sample time with a discrete solver;
  • exposes eight explicit supervisor states;
  • enforces P, Q, available-power, DC-voltage, current, slew, and breaker limits;
  • regenerates its disposable .slx from MATLAB source; and
  • checks scenarios A through H in both MATLAB and Simulink.

Quick start

From the repository root:

addpath('examples/bess-unified-control')
parameters = init_bess_unified_control();
scenarios = bess_validation_scenarios(parameters);
scenarioC = scenarios(strcmp({scenarios.id}, 'C'));
modelPath = build_bess_unified_control_model([], scenarioC, parameters);
result = run_bess_unified_control('C');

The builder creates the disposable native Simulink model configured for Scenario C. The runner separately simulates and plots the reduced-order MATLAB reference for that same scenario; the focused check below compares both paths.

Run the focused no-plot verification:

addpath('examples/bess-unified-control')
run('examples/bess-unified-control/check_bess_unified_control.m')

Run every repository check:

addpath('examples')
run_all_checks

Regenerate machine-readable evidence and original plots:

addpath('examples/bess-unified-control')
generate_bess_validation_evidence("YOUR_COMMIT_SHA")

Reproducible model construction

build_bess_unified_control_model.m is the source of truth. It creates a new model with new_system, configures a fixed-step discrete solver, adds and connects blocks with add_block and add_line, compiles the diagram, and saves it with save_system. The generated .slx is intentionally not committed.

The model contains a scenario-profile source, an executable MATLAB Function block, a 20-signal observable interface, named Outports, and a validation logger. Control and plant behavior remain in reviewable MATLAB functions under src/. A clean checkout can delete any generated model and rebuild it without GUI placement or a base-workspace dependency.

Modes and transition behavior

Original eight-state supervisor diagram

Code State Purpose
1 GRID_FOLLOWING Connected P/Q regulation and optional grid support
2 PREPARE_ISLAND Immediate breaker-open transfer preparation
3 GRID_FORMING Initialize voltage/frequency-forming commands
4 ISLANDED_SUPPORT Supply the local load with droop and restoration
5 SYNCHRONIZING Reduce PCC/grid voltage, frequency, and phase mismatch
6 PREPARE_RECONNECT Hold valid synchronization before closure
7 RECOVERY Delay restart after a cleared measurement fault
8 FAULT_SAFE Open breaker and drive P/Q commands safely toward zero

The paper describes grid-following, grid-supporting, grid-forming, and VSG concepts, but identifies islanding and main-grid reconnection as future work. The eight-state transition supervisor is therefore a PROJECT_ASSUMPTION extension. Breaker closure requires valid measurements and controller readiness plus mismatch no greater than 0.05 p.u., 0.1 Hz, and 5 degrees for the configured hold interval.

Signal interface

All signals are real scalars sampled at 5 ms. Positive active power is BESS discharge/injection into the PCC; charging is negative. Positive reactive power uses the transform convention implemented in bess_power_from_abc.m.

Signal Unit/range Direction Meaning
p_ref_pu, q_ref_pu p.u. input Grid-following power references
voltage_ref_pu p.u., nominal 1 input Grid-forming voltage reference
frequency_ref_Hz Hz, nominal 50 input Grid-forming frequency reference
load_p_pu, load_q_pu p.u. input Local balanced load demand
grid_present Boolean input Utility-grid availability
grid_voltage_pu 0 to 1.3 valid input Grid-equivalent RMS voltage
grid_frequency_Hz 45 to 55 valid input Grid frequency
grid_phase_rad rad input Grid angle used by synchronization
request_grid_following Boolean input Requested connected operating mode
grid_support_enable Boolean input Frequency/voltage support enable
fault_code 0 to 4 input Normal, invalid, stale, bias, or noise
available_power_pu 0 to 1 input DC-side active-power availability
dc_voltage_pu 0.75 to 1.2 valid input Simplified DC readiness
p_pu, q_pu p.u. output PCC active/reactive power
voltage_pu, frequency_Hz p.u., Hz output PCC voltage and frequency
current_pu p.u. output Apparent RMS current magnitude
breaker_closed Boolean output Physical breaker state
state_code 1 to 8 output Supervisor state
status flags Boolean output Ready, sync, saturation, fault, validity
mismatch signals p.u., Hz, rad output Reconnection guard evidence

The complete packed interface is defined by bess_scenario_input_vector.m and the output list in build_bess_unified_control_model.m.

Parameters

All missing numerical source values are centralized PROJECT_ASSUMPTION starter values in bess_unified_control_parameters.m.

Parameter Default Unit Classification
Rated apparent power 10 MVA Project assumption
Nominal line voltage 690 V RMS line-line Project assumption
Nominal frequency 50 Hz Source context/starter
Controller sample time 0.005 s Project assumption
Current limit 1.00 p.u. Project assumption
Active/reactive limits 1.00 / 0.80 p.u. Project assumption
Minimum/maximum DC voltage 0.75 / 1.20 p.u. Project assumption
Dq current/filter time constant 0.040 s Project assumption
Voltage/frequency time constants 0.050 / 0.050 s Project assumption
P-f / Q-V droop 0.50 / 0.050 Hz/p.u., p.u./p.u. Derived starter
Sync thresholds 0.05 / 0.10 / 5 p.u., Hz, deg Project gate

See tuning.md for every replaceable control setting and assumptions.md for its rationale.

Mandatory validation scenarios

ID Scenario Main executable evidence
A Separate grid-following P and Q steps 2% tracking and current gates
B 0% voltage dip/recovery and frequency event bounded recovery and valid state
C Grid loss ordered islanding sequence and open breaker
D Islanded load increase/decrease load balance and V/f regulation
E Grid return with phase/frequency mismatch synchronization interlock and closure
F Infeasible P/Q request current saturation and controlled recovery
G Invalid measurement fault-safe, recovery, resynchronization
H DC availability and bounded bias available-power limiting and validity

The focused v0.9.0 publication metrics are preserved in validation-report.md; use the root validation results for current release and commit-specific CI provenance. The historical machine-readable metrics are in results.json. Plots are supplementary evidence; the acceptance decision comes from bess_score_scenario.m and the test suite.

Source boundary

Directly source-backed concepts include grid-following P/Q operation, PLL/synchronization context, grid-forming P-frequency and Q-voltage behavior, and the publication's qualitative case set. The following are not published fully enough for exact reproduction and are visibly classified as derived or assumed:

  • reduced-order averaged plant and starter ratings;
  • complete controller gains and inner-loop equivalent;
  • state-transition timers, breaker interlocks, and fault recovery;
  • current/DC availability and slew implementations;
  • initial conditions, sample time, and solver; and
  • normalized numeric acceptance gates other than the retained paper FRT statement.

The executable subset implements grid-following, droop-enabled grid support, and stiff grid-forming behavior. It does not implement the paper's separate VSG variant: no swing equation, inertia, AVR, or governor is claimed. The publication's conflicting numeric tables and figure cases are retained as source evidence but are not presented as reproduced validation cases.

The paper also contains conflicting power values, signs, and units. Those conflicts are retained in the source ledger instead of silently selecting a “paper parameter.”

Requirements and engineering detail

Requirements

  • MATLAB R2026a
  • Simulink

No Control System Toolbox, Simscape Electrical, Stateflow, or additional testing toolbox is required. matlab.unittest is part of MATLAB.

License and citation

Repository code and original diagrams are released under the repository's MIT License. The publication remains under its own license; no paper figure is redistributed. Cite the paper using its DOI and cite this repository using CITATION.cff.