Skip to content

fix: close remaining phase 2 baseline QA failures - #6

Merged
power0matin merged 3 commits into
mainfrom
fix/phase2-baseline-qa
Sep 4, 2026
Merged

fix: close remaining phase 2 baseline QA failures#6
power0matin merged 3 commits into
mainfrom
fix/phase2-baseline-qa

Conversation

@power0matin

Copy link
Copy Markdown
Owner
  • feat: complete Phase 2 professional designer
  • fix: close remaining phase 2 baseline QA failures

What changed

Why

Verification

  • corepack pnpm lint
  • corepack pnpm typecheck
  • corepack pnpm test
  • corepack pnpm build
  • corepack pnpm --filter @moduqr/web test:a11y
  • Relevant Playwright E2E tests
  • corepack pnpm audit:prod

QR / privacy checklist

  • New rendering styles were decode-tested when applicable.
  • Sensitive payloads are not added to URLs, logs, analytics, or error reports.
  • UI works with keyboard and at mobile widths.
  • README/docs only describe behavior that is implemented.

Complete the Phase 2 designer, preset library, Scan Safety v2, batch generation, camera scanning, print tooling, design history, sharing, project workflow and related documentation.
@power0matin
power0matin merged commit 435b9ca into main Sep 4, 2026
4 checks passed
@power0matin
power0matin deleted the fix/phase2-baseline-qa branch September 4, 2026 10:26
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant