Last of the three Deployment Considerations PRs. Two new subsections, 6.9 Return Path Provisioning and 6.10 DHCPv4 Relay Considerations.

#22 - lease-triggered origination

One informative paragraph, as the issue specifies. Where the first-hop router is the DHCPv4 relay or snoops relayed traffic, it already holds the lease binding; with the host's link-layer address from ND that is enough to originate the RFC 8950 route at lease grant and withdraw it at lease end - which is what BNGs do for subscriber routes today. Marked as illustration only, with route origination left to RFC 8950 and v4-via-v6. No normative text.

#23 - next-hop identity stability

The failure this prevents is subtle and bites during bring-up: an implementation that moves from an interface-identifier-derived link-local to an RFC 7217 opaque one can do so mid-DHCPv4-exchange, so a return route keyed to the first link-local observed is stale before the host has finished configuring.

Guidance is to key return routes to a stable identity where one exists - a provider-known GUA, a PD-anchored address, or an ND-snooping/SAVI-derived binding (RFC 7513) - with link-local as fallback, and to track identity shifts through ND where only link-locals are available.

One wording call worth flagging: the issue notes RFC 8981 temporaries rotate, with the parenthetical that servers keep use_tempaddr=0. I wrote that as a MUST NOT on temporary addresses as next-hop identity and left the Linux sysctl out, since it is platform-specific detail that dates quickly in an RFC. Easy to soften to a SHOULD if you think MUST overreaches for a Deployment Considerations section.

#21 - DHCPv4 relay

  • Relaying interface needs no IPv4 address; giaddr does need a routable one, but one loopback per relay router covers any number of segments.
  • RFC 3527 link selection decouples giaddr from pool selection where they would be conflated - though flat /32 pools largely dissolve the question, with Option 82 circuit-id (RFC 3046) carrying segment identity where it is still wanted.
  • RFC 7600 and 192.0.0.8/32 cross-referenced for ICMPv4 sourced by IPv6-only transit routers, set against the interface-local sentinel sourcing in 5.3.

The existing on-link gateway validation paragraph moves here from the host implementation notes.

New informative references: RFC 3046, RFC 3527, RFC 7217, RFC 7513, RFC 8981.

With this merged, 6.11 Host Implementation Considerations is back to the single paragraph it should always have been (the separate-stack IPC note); everything else parked there has found its home.

Closes #22, closes #23, closes #21

🤖 Generated with Claude Code

remcovm and others added 3 commits September 23, 2026 16:44
One informative paragraph, as the issue asks. Where the
first-hop router is the DHCPv4 relay or snoops relayed traffic,
it already holds the lease binding; with the host's link-layer
address from ND that is enough to originate the RFC 8950 route
at lease grant and withdraw it at lease end. BNGs originate
subscriber routes this way today.

Explicitly illustration only. Route origination belongs to RFC
8950 and v4-via-v6 territory, and normative text is unchanged.

Closes #22

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Link-locals are shifting identifiers under modern privacy
addressing. An implementation moving from an
interface-identifier-derived address to an RFC 7217 opaque one
can do so during bring-up, mid-DHCPv4-exchange, leaving a return
route keyed to the first link-local seen stale before the host
has finished configuring.

Guidance: prefer a stable next-hop identity where available -- a
provider-known GUA, a PD-anchored address, or an ND-snooping or
SAVI-derived binding (RFC 7513) -- with link-local as fallback.
Where only link-locals exist, origination must track identity
shifts through ND rather than assume the first address persists.

Caveat recorded: RFC 8981 temporary addresses rotate by design
and MUST NOT be used as a next-hop identity.

New informative references: RFC 7217, RFC 7513, RFC 8981.

Closes #23

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Relay behaviour is the first thing an operator checks and the
draft said almost nothing about it.

- The relaying interface needs no IPv4 address; giaddr does need
  a routable one, but one loopback per relay router covers any
  number of segments.
- RFC 3527 link selection decouples giaddr from pool selection
  where the two would be conflated, though flat /32 pools
  largely dissolve the question; Option 82 circuit-id carries
  segment identity where it is still wanted.
- Cross-reference RFC 7600 and 192.0.0.8/32 for ICMPv4 sourced
  by IPv6-only transit routers, alongside the interface-local
  sentinel sourcing in 5.3.

The existing on-link gateway validation paragraph moves here
from the host implementation notes.

New informative references: RFC 3046, RFC 3527.

Closes #21

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
@remcovanmook

remcovanmook commented Sep 23, 2026 •

Copy link
Copy Markdown
Owner Author

Superseded by #42.

@remcovanmook
remcovanmook deleted the dc/return-path branch September 23, 2026 15:07
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants