Skip to content

Release

Release #8

Manually triggered November 3, 2026 14:42
Status Failure
Total duration 15s
Artifacts –

release.yml

on: workflow_dispatch
prepare  /  resolve version and notes
8s
prepare / resolve version and notes
checks  /  ...  /  linting
checks / Reuse linting job / linting
checks  /  ...  /  Validate OpenSpec specs
checks / validate-openspec / Validate OpenSpec specs
Matrix: checks / build
Waiting for pending jobs
tag  /  tag and create the prerelease
tag / tag and create the prerelease
build-tagged  /  ...  /  Validate OpenSpec specs
build-tagged / validate-openspec / Validate OpenSpec specs
build-tagged  /  ...  /  linting
build-tagged / Reuse linting job / linting
Matrix: build-tagged / build
Waiting for pending jobs
assets  /  attach artifacts to the prerelease
assets / attach artifacts to the prerelease
publish-to-pypi
publish-to-pypi
promote  /  promote to latest
promote / promote to latest
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 notice
prepare / resolve version and notes
Process completed with exit code 1.
prepare / resolve version and notes
If you are bumping the version, set the sha256 input default to the actual value above.
prepare / resolve version and notes
actual: 24f397c733add5390fdceee3a2088588ab0d5f944ce00d34cb7029b888cf2db4
prepare / resolve version and notes
expected: 9a1263f24e59a2f508c7b3d3283c9dea94a8bf697f96dbc18cc783cac6284546
prepare / resolve version and notes
git-cliff 2.14.2 checksum mismatch.
prepare / resolve version and notes
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"