Build the right panel of the Data Entry page containing trial tracking, progress bar, success/failure counters, observation notes, and the Done button.
- Trial Navigation Header (e.g., “Trial 2”) with left/right arrow icons.
- Progress Bar with label (e.g., “20% Complete”).
- Counters for
-Successful (green section)
-Unsuccessful (red/beige section)
- Each with “+” and “–” buttons.
- Observation Notes Textbox for typed notes.
- Done Button anchored at bottom right.
- The progress bar shall indicate the progress till 100% of attempts have been completed
- The button "Sign and Submit" button shall be anchored at the bottom right if progress bar shows 100%

Build the right panel of the Data Entry page containing trial tracking, progress bar, success/failure counters, observation notes, and the Done button.
-Successful (green section)
-Unsuccessful (red/beige section)