Skip to content

Milestones

List view

  • Documentation, translations, examples, design tokens and site fixes. Rolling — never closes.

    No due date
    4/27 issues closed
  • The operator-facing govern command group: inventory, discover, propose, apply. Projects the authority plane into something an operator can read and sign.

    Due by November 14, 2026
    9/37 issues closed
  • External directory and secret-store integrations that bind agent principals and secret references to systems the install already runs. Depends on the authority plane.

    Due by November 29, 2026
    2/7 issues closed
  • Per-control evidence derived from the chain, checkable offline by a third party.

    Due by November 30, 2026
    10/29 issues closed
  • Govern a run Bernstein did not schedule: typed ingest, adapters as plugins, receipts that state their own coverage.

    Due by January 1, 2027
    3/14 issues closed
  • Identity is not authority. This milestone builds the plane that records by whose authority an action happened: grants, delegation chains, decisions with a policy version, and receipts that verify offline.

    Due by October 31, 2026
    8/18 issues closed
  • Scale-out layer on the PoC: self-hostable hub with lease-based claims, index federation, earned-only reputation, project-side verification checks. Release window: opens after v3.19.0 closes (2026-10-08) and ships in the following release. An issue carries exactly one milestone, so this work is tracked as an epic here rather than under a version. Depends on milestone 26 landing first. Board view (Category / Maturity / Area): https://github.com/orgs/sipyourdrink-ltd/projects/1

    Due by October 15, 2026
    22/31 issues closed
  • Runtime semantics: scheduler and DAG edge cases, spawn fidelity, sampling-parameter enforcement, metrics reliability.

    Due by September 19, 2026
    50/88 issues closed
  • Architectural and breaking work: zero-code adapter onboarding, CLI surface consolidation, web UI maturation. Scoped by content, not by date.

    Due by December 19, 2026
    56/142 issues closed