Milestones
List view
Documentation, translations, examples, design tokens and site fixes. Rolling — never closes.
No due date•4/27 issues closedThe operator-facing govern command group: inventory, discover, propose, apply. Projects the authority plane into something an operator can read and sign.
Due by November 14, 2026•9/37 issues closedExternal directory and secret-store integrations that bind agent principals and secret references to systems the install already runs. Depends on the authority plane.
Due by November 29, 2026•2/7 issues closedPer-control evidence derived from the chain, checkable offline by a third party.
Due by November 30, 2026•10/29 issues closedGovern a run Bernstein did not schedule: typed ingest, adapters as plugins, receipts that state their own coverage.
Due by January 1, 2027•3/14 issues closedIdentity is not authority. This milestone builds the plane that records by whose authority an action happened: grants, delegation chains, decisions with a policy version, and receipts that verify offline.
Due by October 31, 2026•8/18 issues closedScale-out layer on the PoC: self-hostable hub with lease-based claims, index federation, earned-only reputation, project-side verification checks. Release window: opens after v3.19.0 closes (2026-10-08) and ships in the following release. An issue carries exactly one milestone, so this work is tracked as an epic here rather than under a version. Depends on milestone 26 landing first. Board view (Category / Maturity / Area): https://github.com/orgs/sipyourdrink-ltd/projects/1
Due by October 15, 2026•22/31 issues closedRuntime semantics: scheduler and DAG edge cases, spawn fidelity, sampling-parameter enforcement, metrics reliability.
Due by September 19, 2026•50/88 issues closedArchitectural and breaking work: zero-code adapter onboarding, CLI surface consolidation, web UI maturation. Scoped by content, not by date.
Due by December 19, 2026•56/142 issues closed