Hi, Im in an unusual situation in that i have a single phase over head supply but two electricity meters. Since 2010 ive had 2 grid-tie g98 4.25kw of sw facing panels.Im going to add 75kw of batteries (45kw and 30kw) and 2 x 8kw sunsynks as two complete separate systems electrically except combined at the dual dno head. My intention is two agile accounts. Each of my grid ties on the eps port of each sunsynk with modbus metering keeping my existing fit generation meters. HA and predbat. can predbat and/or ha handle this scenario. Sorry im a ha virgin and no nothing about it.