You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Pass approved UI Reference PNGs into implementation #1347
UI handoffs now call for approved reference images at kickoff. The workflow captures text for role prompts, while the v2 screenshot publisher validates images at delivery. Implementors need the actual approved images in the first implementation turn.
Acceptance
Accept a manifest for designed checkpoints with each approved PNG path, SHA-256, checkpoint, viewport, state, design source and version, and approval reference. Validate the referenced bytes and make the actual PNG available as image input to the Implementor at kickoff, alongside the acceptance test.
Reuse existing PNG handling where possible. Carry the validated reference and its provenance through visual review into the v2 publication receipt so all stages use the same image. An approved design update supplies a new reference and digest.
Exercise the workflow entry point with a PNG and verify that the Implementor receives the expected image in the first call. Cover a missing or mismatched declared image and a normal task without a design reference.
Activity