fix: propagate DASH-STORY-029/AC-013/AR1-S3-G3 version and arithmetic updates across Sprint 5 bundle
Fixes AC-013/AR1-S3-G3 docs-drift left behind after DASH-STORY-029 was pulled into Sprint 5 scope and the DPDP/connection-pooling design docs advanced to v2.3/v2.6: stale "2-item" bundle framing, stale SP totals (34/37 -> 42/45), stale v2.1-v2.5 design-doc citations across both AR.0/AR.1 files, stale "six open user decisions" phrasing (all six now have a disposition), a wrong rule-of-three AC-count recompute in the AR.5/Phase-C files (11+13=24, floor 0.875, not 19/0.8421), a stale "8 SP" DASH-STORY-027 estimate, and two pre-existing stale story-point figures in sprint5_ir1_agent_flags.json's per_item_cross_check found during consensus-agent verification of the fix itself. Docs-only, no source code changed. Reviewed by a solution-architect persona (6 rounds to clean approve) and a consensus-agent persona (2 rounds to clean approve). Fixes #27 Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
1 parent 72a3f96 commit cffda48

6 files changed

Lines changed: 71 additions & 48 deletions

File tree

‎docs/phase-6-sprint-planning/sprint5_sprint_plan.json‎

Lines changed: 3 additions & 3 deletions
Original file line numberDiff line numberDiff line change
@@ -24,7 +24,7 @@
2424
"FR-005": "DASH-STORY-029 (narrower than the full FR: closes only the Zone 5 Shape B storage gap DASH-STORY-027's own design doc surfaced -- FR-005's core domain logic already shipped in Sprint 2's DASH-STORY-017)"
2525
},
2626
"design_doc_map": {
27-
"DASH-STORY-027": "docs/phase-1.5-design/dpdp-crypto-shredding-full-erasure-design.md (DRAFT, not IMPLEMENTATION-READY -- see Section 6 open items)",
27+
"DASH-STORY-027": "docs/phase-1.5-design/dpdp-crypto-shredding-full-erasure-design.md (v2.3, DRAFT, not IMPLEMENTATION-READY -- see Section 6 open items; version cited 2026-09-23 per this file's own design_doc_maturity_note, to match the DASH-STORY-028/029 sibling entries' version-citation pattern)",
2828
"DASH-STORY-028": "docs/phase-1.5-design/connection-pooling-design.md (v2.6, DRAFT, not IMPLEMENTATION-READY -- 1 open item disclosed: pool sizing is now BLOCKED on a real load-test prerequisite (DASH-STORY-028-LOADTEST, see backlog_draft.json), not merely 'unmeasured and acceptable as a documented default' as prior versions framed it; the circuit-breaker-vs-pool item remains RESOLVED per v2.3/v2.4; DI wiring point verification was resolved in v2; v2.2 added an explicit rollback procedure per a consensus-agent finding; v2.4 added breaker-OPEN Retry-After/error-code disambiguation per a further consensus-agent finding; v2.6 fixed the Change Log's row ordering -- updated 2026-09-22)",
2929
"DASH-STORY-029": "docs/phase-1.5-design/zone5-shape-b-storage-design.md (v4, DRAFT, not IMPLEMENTATION-READY -- 5 open items disclosed in Section 8: subject_id Shape A/B signature symmetry, subject_item_index resolution reconciliation, unaudited Postgres-native concurrency, undecided compliance-role-creation file location, no real-Postgres load/integration test yet; v4 also narrowed the 'zero orchestrator code changes' claim to 'zero behavioral/call-site changes' after a consensus-agent finding on the constructor's concrete-class typing)"
3030
},
@@ -57,7 +57,7 @@
5757
"id": "SP5-RISK-3",
5858
"severity": "LOW",
5959
"story": "DASH-STORY-028",
60-
"risk": "UPDATED 2026-09-22 (user-directed correction): pool sizing (min/max) is not backed by real load-test data -- the design doc's own recommended defaults are now explicitly PROVISIONAL/BLOCKED (connection-pooling-design.md v2.5 Section 4/8 item 1), not merely an acceptable documented default as this risk item previously framed it. A new lightweight sub-task, DASH-STORY-028-LOADTEST, is now the tracked blocking prerequisite for DASH-STORY-028-DEV -- see backlog_draft.json and sprint5_ar1_assignments.json's dependency_integrity_check. This risk downgrades from an open question to a scheduled, gated prerequisite once DASH-STORY-028-LOADTEST is dispatched in a future Phase B pass; it remains LOW severity because it blocks only DASH-STORY-028-DEV's start, not the sprint's overall plan. The sibling circuit-breaker-vs-pool risk this item used to sit alongside remains RESOLVED (v2.3 Section 5.1). Citation bumped to v2.5."
60+
"risk": "UPDATED 2026-09-22 (user-directed correction): pool sizing (min/max) is not backed by real load-test data -- the design doc's own recommended defaults are now explicitly PROVISIONAL/BLOCKED (connection-pooling-design.md v2.6 Section 4/8 item 1), not merely an acceptable documented default as this risk item previously framed it. A new lightweight sub-task, DASH-STORY-028-LOADTEST, is now the tracked blocking prerequisite for DASH-STORY-028-DEV -- see backlog_draft.json and sprint5_ar1_assignments.json's dependency_integrity_check. This risk downgrades from an open question to a scheduled, gated prerequisite once DASH-STORY-028-LOADTEST is dispatched in a future Phase B pass; it remains LOW severity because it blocks only DASH-STORY-028-DEV's start, not the sprint's overall plan. The sibling circuit-breaker-vs-pool risk this item used to sit alongside remains RESOLVED (v2.3 Section 5.1). Citation bumped to v2.6 (Change-Log-ordering fix, 2026-09-22)."
6161
},
6262
{
6363
"id": "SP5-RISK-4",
@@ -77,5 +77,5 @@
7777
"None of the three stories has a GitHub issue yet -- AR1-S3-G3 was raised inline in sprint3_ar1_assignments.json's routing_gaps, not as its own GitHub issue; AC-013's gap has no GitHub issue either (DASH-STORY-020's own Review sub-task text is the closest prior tracking artifact); DASH-STORY-029 has no GitHub issue since it was pulled into scope by this same docs-only pass. Opening GitHub issues for all three, per this project's Section 5 issue-first convention, is a Phase B pre-dispatch action, not performed by this docs-only pass.",
7878
"DASH-STORY-029 (8 SP, Dev 5/QA 2/Review 1) was estimated 2026-09-22 (solution-architect) calibrated against DASH-STORY-017 (Zone 5 Shape A, full domain-logic build, 8 SP) and DASH-STORY-018 (Zone 8 Shape B store, 8 SP) -- narrower than either in that it implements an already-specified interface against an already-built domain model, but carries comparable new surface area (schema, role extension, 6 repository methods, migration wiring). See backlog_draft.json's own story_points_note for the full reasoning."
7979
],
80-
"loadtest_prerequisite_sp_note": "DASH-STORY-028-LOADTEST is a new 3 SP lightweight sub-task (see backlog_draft.json:sprint_5_stories[DASH-STORY-028].prerequisite_sub_task for the shape reasoning -- sub-task, not a standalone story) that must run and produce real load-test numbers before DASH-STORY-028-DEV starts. This 3 SP is a small fixed addition tracked separately from DASH-STORY-028's existing 21 SP Dev/QA/Review split -- it is not folded into total_story_points (34) because it precedes and gates DASH-STORY-028-DEV rather than being part of that story's own wiring-refactor/circuit-breaker implementation scope. If a future revision folds it in, the correct total would become 37 (34 + 3)."
80+
"loadtest_prerequisite_sp_note": "DASH-STORY-028-LOADTEST is a new 3 SP lightweight sub-task (see backlog_draft.json:sprint_5_stories[DASH-STORY-028].prerequisite_sub_task for the shape reasoning -- sub-task, not a standalone story) that must run and produce real load-test numbers before DASH-STORY-028-DEV starts. This 3 SP is a small fixed addition tracked separately from DASH-STORY-028's existing 21 SP Dev/QA/Review split -- it is not folded into total_story_points (42, updated 2026-09-22 after DASH-STORY-029 was pulled into scope) because it precedes and gates DASH-STORY-028-DEV rather than being part of that story's own wiring-refactor/circuit-breaker implementation scope. If a future revision folds it in, the correct total would become 45 (42 + 3)."
8181
}

‎docs/phase-7-routing/sprint5-ar5-rs-computation.md‎

Lines changed: 28 additions & 15 deletions
Original file line numberDiff line numberDiff line change
@@ -3,6 +3,11 @@
33
**Formula (reused unchanged from Sprint 1-4):** `RS = sqrt(a x b)`, where `a` is a
44
citation/consistency check and `b` is an atomic-fact check, each in `[0,1]`.
55

6+
**Scope note (added 2026-09-23):** This computation covers DASH-STORY-027 and DASH-STORY-028 only.
7+
DASH-STORY-029 (Zone 5 Shape B storage) was pulled into Sprint 5 scope AFTER this AR.5 pass was
8+
produced, so it is NOT covered by the RS=1.00 figure or the rule-of-three floor below — it requires
9+
its own separate AR.5/Phase-C coverage before being treated as execution-ready alongside 027/028.
10+
611
## Inputs
712

813
- **a (citation/consistency):** `1.00`. Every score, agent name, file path, and dependency edge
@@ -20,13 +25,15 @@ citation/consistency check and `b` is an atomic-fact check, each in `[0,1]`.
2025

2126
## Rule-of-three statistical floor
2227

23-
- AC count: **updated 2026-09-22, FINAL** (was stale at 16 -- a consensus-agent-driven review loop
24-
on `connection-pooling-design.md` added `AC-028-QA-3` and `AC-028-REVIEW-3`/`AC-028-REVIEW-4`
25-
after this file's own round-7 refresh, without this file being updated). AC-027-DEV-1/2/3 = 3,
26-
AC-027-QA-1/2 = 2, AC-027-REVIEW-1/2/3/4 = 4 (subtotal 9); AC-028-DEV-1/2/3 = 3,
27-
AC-028-QA-1/2/3 = 3, AC-028-REVIEW-1/2/3/4 = 4 (subtotal 10) — total unique AC IDs across
28-
`sprint5_ar1_assignments.json` = 9+10 = **19**.
29-
Rule-of-three floor at n=19: `3/19 = 0.1579 -> 1 - 0.1579 = 0.8421`.
28+
- AC count: **updated 2026-09-23, FINAL** (was stale at n=19 -- undercounted by one AC each for
29+
AC-027-DEV and AC-028-DEV/QA, per a direct recount of `sprint5_ar1_assignments.json`'s current
30+
`acceptance_criteria` arrays). AC-027-DEV-1/2/3/4 = 4, AC-027-QA-1/2/3 = 3,
31+
AC-027-REVIEW-1/2/3/4 = 4 (subtotal 11); AC-028-DEV-1/2/3/4 = 4, AC-028-QA-1/2/3/4 = 4,
32+
AC-028-REVIEW-1/2/3/4/5 = 5 (subtotal 13) — total unique AC IDs across
33+
`sprint5_ar1_assignments.json`'s DASH-STORY-027/028 Dev/QA/Review sub-tasks = 11+13 = **24**. The
34+
3 `AC-028-LOADTEST-*` IDs (a separate prerequisite sub-task) and DASH-STORY-029's own ACs (out of
35+
this pass's scope, see note above) are excluded from this n=24 figure.
36+
Rule-of-three floor at n=24: `3/24 = 0.125 -> 1 - 0.125 = 0.875`.
3037
- `RS = 1.00` clears this floor.
3138

3239
## Why this RS figure carries LESS evidentiary weight than Sprint 1-4's own RS=1.00 figures
@@ -41,12 +48,14 @@ it:
4148
2. **Both underlying design docs remain formally NOT IMPLEMENTATION-READY, though both now have
4249
real, dedicated review history.** UPDATED 2026-09-22, FINAL (was: "connection-pooling-design.md
4350
is still v1, one authoring pass, no review rounds" -- stale after that doc's own dedicated
44-
2-round adversarial solution-architect review): `connection-pooling-design.md` is now v2.2,
51+
2-round adversarial solution-architect review): `connection-pooling-design.md` is now v2.6,
4552
having been through its own dedicated 2-round review (round 1 found a real defect in its
4653
migration description and a missing Zone 8 scope; round 2 verified the fix and caught 2 further
4754
issues, both fixed; a third fix pass added an explicit rollback procedure per a subsequent
48-
consensus-agent finding, bumping to v2.2; final verdict APPROVE). `dpdp-crypto-shredding-full-erasure-design.md` is
49-
v2.2, having been through 13 solution-architect rounds AND a separate 4-round consensus-agent
55+
consensus-agent finding, bumping to v2.2; further advanced by a mandatory-circuit-breaker round,
56+
a Retry-After/error-code disambiguation round, a load-test-prerequisite round, and a Change-Log-
57+
ordering fix; final verdict APPROVE). `dpdp-crypto-shredding-full-erasure-design.md` is
58+
v2.3, having been through 13 solution-architect rounds AND a separate 4-round consensus-agent
5059
failure-mode/retry/rollback/escalation review, both ending in clean APPROVE. Neither doc is
5160
formally marked IMPLEMENTATION-READY in its own Status line — that label is reserved for a doc
5261
that has also cleared a real dispatched Phase C hallucination/faithfulness gate, which has not
@@ -66,13 +75,17 @@ RS=1.00 figures.** Recommend, before this bundle is treated as execution-ready f
6675
dispatch:
6776
1. A real Phase C gate (dispatched `hallucination-detector` + `context-faithfulness-engineer`),
6877
per `sprint5-phase-c-gate-results.md`'s own recommendation.
69-
2. UPDATED 2026-09-22, FINAL: both design docs have now cleared their own dedicated review loops
70-
with a final clean APPROVE (connection-pooling-design.md v2.2; dpdp-crypto-shredding-full-
71-
erasure-design.md v2.2). This item is resolved -- remaining before either is formally marked
78+
2. UPDATED 2026-09-23, FINAL: both design docs have now cleared their own dedicated review loops
79+
with a final clean APPROVE (connection-pooling-design.md v2.6; dpdp-crypto-shredding-full-
80+
erasure-design.md v2.3). This item is resolved -- remaining before either is formally marked
7281
IMPLEMENTATION-READY is a real dispatched Phase C gate (item 1 above), not a further design
7382
review round.
74-
3. Resolution of the six open user decisions raised across this Sprint 5 bundle (SP5-DEC-001
75-
through 004 in `sprint5_ar0_routing_index.json`; SP5-DEC-101/102 in `sprint5_ar1_assignments.json`).
83+
3. UPDATED 2026-09-23: all six user decisions raised across this Sprint 5 bundle now have a
84+
disposition (SP5-DEC-001/002 CONFIRMED, SP5-DEC-003 DEFERRED, SP5-DEC-004 SUPERSEDED in
85+
`sprint5_ar0_routing_index.json`; SP5-DEC-101 RESOLVED, SP5-DEC-102 SUPERSEDED in
86+
`sprint5_ar1_assignments.json`) -- no longer an "open decisions" item blocking dispatch. DASH-
87+
STORY-029 (pulled into scope after this file was produced) still needs its own AR.5/Phase-C
88+
coverage before being treated as execution-ready alongside 027/028 -- see the scope note above.
7689

7790
This conditionality is carried forward into `sprint5_ir1_agent_flags.json`'s own
7891
`execution_readiness` determination.

‎docs/phase-7-routing/sprint5-phase-c-gate-results.md‎

Lines changed: 16 additions & 7 deletions
Original file line numberDiff line numberDiff line change
@@ -6,6 +6,11 @@ pooling), covering `sprint5_ar0_routing_index.json`, `sprint5_ar1_assignments.js
66
`docs/phase-1.5-design/dpdp-crypto-shredding-full-erasure-design.md`, and
77
`docs/phase-1.5-design/connection-pooling-design.md`.
88

9+
**Scope note (added 2026-09-23):** DASH-STORY-029 (Zone 5 Shape B storage) was pulled into Sprint 5
10+
scope AFTER this Phase C self-check was produced, so it is NOT covered by the PASS verdict below —
11+
it requires its own separate Phase C coverage before being treated as execution-ready alongside
12+
027/028.
13+
914
**Post-hoc update (2026-09-22, solution-architect review round 6) — this file's own "everything
1015
else checked and found accurate" claim below was WRONG on one major point.** A genuinely dispatched
1116
solution-architect review (round 6, after this self-check was written) found that the DPDP design
@@ -50,13 +55,17 @@ research-agent reports and direct file reads earlier in this conversation for `d
5055
originally noted (2026-09-22, before round 6): `sprint5_ar1_assignments.json`'s `DASH-STORY-027`
5156
`story_points: 13` and its `sub_task_sp_sum` (8+3+2=13) were internally consistent but had no
5257
design-doc-review-round history behind them, a first-pass estimate against a v1 DRAFT design.
53-
**UPDATED 2026-09-22 per solution-architect review round 8**: that original 13 SP figure no longer
54-
exists -- round 6 re-scoped DASH-STORY-027 from "build from scratch" (13 SP) to "wire and extend
55-
already-built prior art" (8 SP, sub_task_sp_sum 5+2+1=8) after finding the design doc's own "what
56-
ships today" baseline was false. The CURRENT estimate (8 SP) now has substantial review history
57-
behind it -- 8 documented solution-architect rounds against the design doc it's estimated from,
58-
v2.0 -- closer to Sprint 4's FR-013 precedent than the original single-pass estimate this
59-
paragraph originally flagged as provisional.
58+
**UPDATED 2026-09-23, FINAL (was: "8 SP", "v2.0" -- both stale)**: round 6 re-scoped DASH-STORY-027
59+
from "build from scratch" (13 SP) to "wire and extend already-built prior art" (8 SP,
60+
sub_task_sp_sum 5+2+1=8) after finding the design doc's own "what ships today" baseline was false.
61+
That 8 SP figure was itself later superseded: a consensus-agent review found the wire-and-extend
62+
scope still needed a real write-ahead-marker/recovery-sweep durability mechanism (Section 7) that
63+
had been undercounted, and DASH-STORY-027 was re-estimated back to **13 SP** (sub_task_sp_sum
64+
5+3+4=... see `sprint5_ar1_assignments.json`'s own `story_points_note` for the exact split and
65+
history: 13→8→13). The CURRENT estimate (13 SP) now has substantial review history behind it --
66+
13 documented solution-architect rounds plus a separate 4-round consensus-agent review, against the
67+
design doc it's estimated from, now **v2.3** -- closer to Sprint 4's FR-013 precedent than the
68+
original single-pass estimate this paragraph originally flagged as provisional.
6069

6170
**Everything else checked and found accurate:** every agent name cited across the six Sprint 5